Council archive · source document
Decision Letter - Change to an Existing Approval - 010.2006.00000138.002 [As Published] · 132006.138.02
2006/138
23. The proposed turning area at the entry of the proposed carpark shall be sign posted to
indicate that the area is a “Turning Area Only” and that “No Parking is Permitted”.
24. All vehicles shall enter and leave the site in a forward direction.
Frontage Works
25. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
frontage of the site in accordance with Planning Scheme Policy PSP1 Landscaping
Guidelines. Grass shall be couch, free of weeds.
26. A new 1.5m wide concrete path shall be constructed along the Weyba Street frontage of the
site in accordance with Council’s design standards and to an alignment that protects any
significant vegetation or any underground services.
27. Where applicable, all redundant vehicular crossings to the site shall be removed and replaced
by kerb & channel, footpath paving and landscaping such as trees and grasses in accordance
with Council’s Standard specifications prior to commencement of the use permitted by this
permit.
Pathway Contributions
28. Deleted
Park Contributions
29. Deleted
Stormwater Drainage
30. All roof runoff from any new dwelling shall be directed to individual rainwater storage system
or tank (minimum storage 3000 litres per dwelling unit) that is installed to ensure water from
the tank can be used for external uses (such as watering gardens, irrigation, ornamental
ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for use in
flushing of toilets internal to the dwelling. All rainwater tanks are to be designed and installed
in accordance with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks,
and shall be part of the plumbing application in conjunction with the building approval. The
location and capacity of the tanks shall be clearly shown on the plans submitted for Building
Works approval.
31. All stormwater overflows from the water tank/s and stormwater runoff from paved areas
(excluding underground parking area and the internal access driveway) shall be collected on
site and discharged to Council’s kerb & channel street drainage system in Weyba Street.
Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer
and submitted to Council prior to obtaining a Development Permit for Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
drainage system at any one location is 25 litres/second.
32. The applicant shall ensure that the development will not adversely affect the existing drainage
conditions on adjoining properties and that no additional runoff from the site is discharged onto
these properties due to this development. The stormwater runoff from roof and outdoor
paved areas for all storms up to and including 100 years storm event are directed (by pipes or
overland flow paths) to Weyba Street.
33. An infiltration pit for the drainage of the access driveway and the underground carpark shall be
designed generally in accordance with Drawing No 16078-OW1 dated January 2006 by SCG
Consulting Engineers and certified by a registered geotechnical engineer ensuring the
proposed infiltration pit will not cause any adverse impact or nuisance seepage to other
properties. A Development Permit for Operational Works shall be required.
34. All site stormwater drainage shall be by means of a gravity system.
Page 4 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - 010.2006.00000138.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 188 KB (small file)
- File type
No other editions are linked here.