Decision Letter - Change to an Existing Approval - 010.2006.00000138.002 [As Published] · 132006.138.02
2006/138
43. All earthworks, foundation works and earthworks equipment used on the site shall take into
consideration the recommendations and the findings provided in the geotechnical report (site
investigation report No 15078 (S)) by SCG Consulting Engineers dated 31 March 2006.
44. A Geotechnical Engineer or similar qualified expert shall inspect the site and establish whether
any measures are required to protect the stability of adjoining buildings and/or structures, and
shall inspect the excavations to confirm the founding soil material and that the methods of
construction recommended in the geotechnical report No 16078 (S) dated 31 March 2006 and
the engineering drawing No 16078-OW1 dated January 2006 by SCG Consulting Engineers
are appropriate to the site. Copies of all inspection reports are to be submitted to Council to be
kept on the file of the Development Permit for Operational Works.
45. An existing Conditions Survey is to be carried out on adjoining structures, fences and
landscaping prior to any construction works taking place on site. If distress already exists, a
photographic survey shall be undertaken, the distress measured and a plan to monitor
changes to distress shall be implemented. A copy of this report is to be submitted to Council
within 5 business days of survey and prior to construction work proceeding.
Erosion and Sediment Control
46. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
General
47. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
48. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
49. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Environmental Health
50. Noise emission from swimming pool and spa equipment (including heating equipment) shall
comply with the following requirements:
50.1. The equipment shall be installed and located in a manner that prevents excessive noise
in accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement
Notices (on-the-spot fines) may apply for offences.
50.2. A person must not use equipment on any day if it makes or causes noise to be made –
50.2.1. From 10pm to 7am: Which is audible outside the most exposed part of an
affected building
50.2.2. From 7am to 7pm: More than the lower of either –
50 dB(A)
5 dB(A) above the background noise level
50.2.3. From 7pm to 10pm: More than 3 dB(A) above the background noise level.
51. Noise emission from air conditioning equipment shall comply with the following requirements:
Page 6 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - 010.2006.00000138.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 188 KB (small file)
- File type
No other editions are linked here.