B
TENANT'S
2 SIGNAGE TENANT'S SIGNAGE 202
301
METAL ROOF
RL 18.931
METAL ROOF
LEVEL 02
RL 16.186 RL16.900
3000
LEVEL 01
RL13.900
COMMERCIAL
5000
1600 M2
GROUND FLOOR
RL8.900
FIRE STAIR 01 SHS COLUMNS DOWNPIPE METAL MESH SHOPFRONT GLAZING HORIZONTAL ALUMINUM LEVEL 2 GLAZING LIFT CORE +
(PAINTED MASONRY) FIRE STAIR (POWDERCOATED FINISH) BALUSTRADE (POWDERCOATED FRAME) TIMBER LOOK BATTENS (POWDERCOATED FRAME) FIRE STAIR 02
FROM BASEMENT (PAINTED MASONRY )
1 ELEVATION Front Elevation
100 Scale: 1 : 100
A
202
A B C D E F G H I
METAL ROOF METAL ROOF
RL 18.911
5°
1828
LEVEL 02 RL 16.340 LEVEL 02
RL16.900 GLAZING RL16.900
GLAZING
VERTICAL ALUMINIUM TIMBER
1200
(Powdercoated Frame)
LOOK BATTEN SCREEN
COMMERCIAL
GLAZING
3000
2700
700 m2
COLORBOND
1500
WINDOW HOOD
LEVEL 01 LEVEL 01
RL13.900 RL13.900
1700
CHS COLUMN
(POWDERCOATED)
SHOWROOM
GLAZING
GLAZING
700 m2
3000
(POWDERCOATED)
GROUND FLOOR GROUND FLOOR
RL8.900 RL8.900
REFUSE COLLECTION
WITH SCREEN PAINTED MASONRY UPPER LEVEL LIFT CORE FIBRE CEMENT CLADDING COMMERCIAL SHOPFRONT FIBRE CEMENT CLADDING
COVERED WALKWAY (PAINT FINISH) (PAINT FINISH) (POWDERCOATED Frame) (JAMES HARDIE OBLIQUE CLADDING OR SIMILAR)
ELEVATION Western Elevation
2 Scale: 1 : 100
Rev Description Date CLIENT PROJECT TITLE DRAWN BY CHECKED BY DATE
A Preliminary Issue 14.10.25 KW SM 17.11.2025
B Preliminary Issue 17.11.25
Suite 12, Level 2, 30 Florence St Proposed Commercial Centre ELEVATIONS - FRONT & WESTERN ELEVATION
Teneriffe, QLD 4005 SCALE (@ A1) PROJECT NUMBER
C Draft DA Issue 18.06.26 1 : 100 25114
D DA Issue 25.06.26 [email protected] MK Architecture Pty Ltd Copyright. Except under whats allowed under copy right law, no part of this drawing may be reproduced or otherwise dealt with, without written permission of MK Architecture Pty Ltd. DRAWING NUMBER REV
E DA Issue 09.07.26 www.mkarchitecture.com.au
F DA Issue 16.07.26
Builder/Contractor shall verify job dimensions before any job commences. Figured dimensions take precedence over drawings and job dimensions. All shop drawings shall be submitted to the
Architect/Consultant, and manufacture shall not commence prior to return of inspected shop drawings by the Architect/Consultant. DA - 203 F
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2. Amended Architectural Plans (Rec 27.7.26).pdfRelated documentApplication case desk ↗
About this file
- File size
- 48.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.