2017-09-12 P&E Agenda - Attachments 1, 2 & 3 to Item 8 - Local Government Infrastructure Plan

of 18

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 PIA Service Catchment      IPA Planning Scheme Zone               Conversion Rate
                            Urban Development                  Urban Developable area to
                                                                   Impervious area
                                                                    (IPA Planning Scheme
                                                             max allowable non-landscaped area)
                            Village Mix                                     0.9
                            Detached Housing                               0.65
 7. Pomona Town             Semi-Attached Housing                          0.76
                            Industry                                       0.85
                            Community Services                             0.85
                            Detached Housing                                0.8
                            Attached Housing                               0.82
                            Semi-Attached Housing                          0.76
 8. Noosa Heads             Community Services                             0.85
                            Business Centre                                 0.9
                            Visitor Mixed Use                               0.9
                            Neighbourhood Centre                            0.9
                            Detached Housing                                0.8
                            Attached Housing                               0.82
                            Semi-Attached Housing                          0.76
                            Industry                                       0.85
 9. Noosaville              Community Services                             0.85
                            Business Centre                                 0.9
                            Visitor Mixed Use                               0.9
                            Neighbourhood Centre                            0.9
                            Shire Business Centre                           0.9
                            Detached Housing                               0.75
                            Attached Housing                               0.82
                            Semi-Attached Housing                          0.76
                            Community Services                             0.85
 10. Tewantin               Business Centre                                 0.9
                            Neighbourhood Centre                            0.9
                            Detached Housing                               0.75
                            Attached Housing                               0.82
                            Semi-Attached Housing                          0.76


The ultimate impervious area possible for each urban development zone/type was derived
from applying the ultimate urban developable lot areas with their respective conversion
rates. The resulting ultimate urban impervious areas were then apportioned according to the
LGIP’s PIA development planning assumptions (total dwellings and gfa projections) to derive
the projected demand over time for each Stormwater PIA service catchment (refer to excel
spreadsheet: Stormwater Demand Calc.xlsx). The resulting total Stormwater demand for the
service catchments is summarised in Table 1.3 below:
Table 1.3 – Total Stormwater Demand (Impervious Hectares)
   PIA Service Catchment       2014       2016      2021        2026        2031      Ultimate
  1. Boreen Point Village       11.34      12.43     13.13       13.28       13.35        14.38
  2. Kin Kin Village             9.56      10.48     11.16       11.56       11.75        13.76
  3. Cooroibah Village           4.48       4.59      4.91        4.91        4.91         4.95
  4. Cooroy Town               124.18     128.57    151.01      157.96      174.72      213.91
  5. Eastern Beaches           252.12     255.39    259.98      271.12      286.34      305.87
  6. Cooran Village             23.18      24.19     28.92       29.04       31.82        39.65
  7. Pomona Town                54.42      57.59     68.14       68.38       74.40      110.72
  8. Noosa Heads               156.37     161.72    169.06      170.85      171.43      183.00
  9. Noosaville                262.76     274.12    291.25      298.88      302.98      371.39
  10. Tewantin                 247.08     252.05    261.06      264.66      266.06     306.05




                                             3
Log in to download the original file

2017-09-12 P&E Agenda - Attachments 1, 2 & 3 to Item 8 - Local Government Infrastructure Plan(PDF, 9MB).pdf · 9.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.