Original source · versioned page text
2017-09-12 P&E Agenda - Attachments 1, 2 & 3 to Item 8 - Local Government Infrastructure Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn PIA Service Catchment IPA Planning Scheme Zone Conversion Rate
Urban Development Urban Developable area to
Impervious area
(IPA Planning Scheme
max allowable non-landscaped area)
Village Mix 0.9
Detached Housing 0.65
7. Pomona Town Semi-Attached Housing 0.76
Industry 0.85
Community Services 0.85
Detached Housing 0.8
Attached Housing 0.82
Semi-Attached Housing 0.76
8. Noosa Heads Community Services 0.85
Business Centre 0.9
Visitor Mixed Use 0.9
Neighbourhood Centre 0.9
Detached Housing 0.8
Attached Housing 0.82
Semi-Attached Housing 0.76
Industry 0.85
9. Noosaville Community Services 0.85
Business Centre 0.9
Visitor Mixed Use 0.9
Neighbourhood Centre 0.9
Shire Business Centre 0.9
Detached Housing 0.75
Attached Housing 0.82
Semi-Attached Housing 0.76
Community Services 0.85
10. Tewantin Business Centre 0.9
Neighbourhood Centre 0.9
Detached Housing 0.75
Attached Housing 0.82
Semi-Attached Housing 0.76
The ultimate impervious area possible for each urban development zone/type was derived
from applying the ultimate urban developable lot areas with their respective conversion
rates. The resulting ultimate urban impervious areas were then apportioned according to the
LGIP’s PIA development planning assumptions (total dwellings and gfa projections) to derive
the projected demand over time for each Stormwater PIA service catchment (refer to excel
spreadsheet: Stormwater Demand Calc.xlsx). The resulting total Stormwater demand for the
service catchments is summarised in Table 1.3 below:
Table 1.3 – Total Stormwater Demand (Impervious Hectares)
PIA Service Catchment 2014 2016 2021 2026 2031 Ultimate
1. Boreen Point Village 11.34 12.43 13.13 13.28 13.35 14.38
2. Kin Kin Village 9.56 10.48 11.16 11.56 11.75 13.76
3. Cooroibah Village 4.48 4.59 4.91 4.91 4.91 4.95
4. Cooroy Town 124.18 128.57 151.01 157.96 174.72 213.91
5. Eastern Beaches 252.12 255.39 259.98 271.12 286.34 305.87
6. Cooran Village 23.18 24.19 28.92 29.04 31.82 39.65
7. Pomona Town 54.42 57.59 68.14 68.38 74.40 110.72
8. Noosa Heads 156.37 161.72 169.06 170.85 171.43 183.00
9. Noosaville 262.76 274.12 291.25 298.88 302.98 371.39
10. Tewantin 247.08 252.05 261.06 264.66 266.06 306.05
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.