Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
3. PUBLIC PARKS & LAND FOR COMMUNITY FACILITIES NETWORK - DEMAND
   ASSUMPTIONS

   3.1. Service Catchments
The Public Parks & Land for Community Facilities network in Noosa Shire is an open
network with the service catchment geography aligning with the planning scheme localities
identified on the Public Parks & Land for Community Facilities network maps and
summarised in Table 3.1.
Table 3.1 - Adopted Public Parks & Land for Community Facilities Service Catchments
           Planning Scheme Locality                              LGIP Map Reference
           Service Catchment Name
    1.   Boreen Point, Kin Kin & Cootharaba          LGIP-PFTI Public Parks & LCF - Map 1
    2.   Cooroibah                                   LGIP-PFTI Public Parks & LCF - Map 2
    3.   Cooroy & Lake Macdonald                     LGIP-PFTI Public Parks & LCF - Map 3
    4.   Eastern Beaches                             LGIP-PFTI Public Parks & LCF - Map 4
    5.   Mary River Catchment                        LGIP-PFTI Public Parks & LCF - Map 5
    6.   Noosa Heads                                 LGIP-PFTI Public Parks & LCF - Map 6
    7.   Noosa North Shore                           LGIP-PFTI Public Parks & LCF - Map 7
    8.   Noosaville                                  LGIP-PFTI Public Parks & LCF - Map 8
    9.   Tewantin & Doonan                           LGIP-PFTI Public Parks & LCF - Map 9


   3.2. Demand Assumptions
The demand generation rate for the Public Parks and Land for Community Facilities network
is stipulated in the LGIP Desired Standards of Service, Quantitative Standards which
amounts to 3.7 ha/1000 resident population.
The estimated Public Parks & Land for Community Facilities demand over time for each
service catchment is therefore the development planning assumptions resident population
estimated within each planning scheme locality (both inside + outside the PIA) (refer to excel
spreadsheet: Public Parks & LCF Demand Calc.xlsx). The resulting total Public Parks &
Land for Community Facilities demand for the service catchments is summarised in Table
3.2 below:
Table 3.2 – Total Public Parks & Land for Community Facilities Demand (Resident
persons)
     Locality Service Catchment          2014         2016     2021     2026     2031    Ultimate
1. Boreen Point, Kin Kin & Cootharaba    2,220        2,323    2,289    2,466    2,491     2,540
2. Cooroibah                             1,833        1,882    1,942    2,091    2,123     2,238
3. Cooroy & Lake Macdonald               6,614        6,776    7,316    8,000    8,487     8,750
4. Eastern Beaches                      10,903       10,997   11,190   11,576   12,328    12,698
5. Mary River Catchment                  5,955        6,051    6,395    6,891    7,202     7,771
6. Noosa Heads                           4,338        4,557    4,959    5,089    5,081     5,399
7. Noosa North Shore                      497          497      484      521      526       531
8. Noosaville                            8,272        8,419    8,537    8,671    8,803     9,913
9. Tewantin & Doonan                    12,014       12,138   12,451   12,860   13,120    14,226
                TOTAL                   52,646       53,638   55,562   58,164   60,160    64,065




                                                 5
Log in to download the original file

2017-09-12 P&E Agenda - Attachments 1, 2 & 3 to Item 8 - Local Government Infrastructure Plan(PDF, 9MB).pdf · 9.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.