Original source · versioned page text
2020-11-19 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 19 NOVEMBER 2020
The establishment of the vegetation offsets for each stage must be
completed prior to the commencement of the use for each stage. The
Vegetation Clearing Offset program, required by these conditions, must be
implemented in a staged manner reflective of the approved staging of the
development. To this end separate Vegetation Clearing Offset programs
must be developed to reflect the staged delivery of the development, in
particular the staged development of lot 6, and the subsequent development
of lot 9.
12.4 No clearing is permitted unless in accordance with the approved staged
Vegetation Clearing Offset program.
14. The Vegetation Management operational works application must detail the location
and extent and staging of vegetation disturbance on Lot 9 SP252905 and Lot 6
RP901384 must be accurately marked on-site, including any setback requirements
for bushfire mitigation purposes, for Council officers to inspect prior to
commencement of any vegetation clearing.
Bushfire
23. A bushfire evacuation plan for the site must be prepared by a qualified person and
submitted to Council prior to the issue of any Development Permit for Operational
Works.
CIVIL ENGINEERING
Frontage Works
33. Pedestrian crossings shall be provided in Grasstree Court generally as shown on
‘Masterplan’ prepared by Thomson Adsett dated 15 October 2020, Plan Ref:
DA_106 Rev. 3. The crossing shall include linemarking and suitable signage in
accordance with the MUTCD.
Vehicle Access
35. Vehicular access driveways to service the development shall be constructed from
the Grasstree Court frontages of the site. The driveways shall be generally in
accordance with Council’s standard drawing SEQ R-051 and Masterplan’ prepared
by Thomson Adsett dated 15 October 2020, Plan Ref: DA_106 Rev. 3.
40. All internal roads shall be designed and constructed in accordance with Council’s
Planning Scheme Policy 5 – Engineering Design Standards – Roads, Drainage
and Earthworks. The roads shall be:
40.1 Generally in accordance with drawing number ‘Masterplan’ prepared by
Thomson Adsett dated 15 October 2020, Plan Ref: DA_106 Rev. 3,
40.2 A minimum width of 5.5 metres, and
40.3 Suitable for Council’s refuse collection vehicle to traverse through the site
Car Parking
41. Carparking shall be provided within the sites generally as shown on drawings
numbered DA_114 “Masterplan/Carpark Layout” Rev. 3 prepared by Thomson
Adsett Architects dated 15 October 2020 and DA_133 “Apartment Buildings –
Basement” prepared by Smith and Tracey Architects dated November 2018 and
within the “Independent Living Units” as shown the approved floor plans, except as
modified herein.
Page 14 of 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.