Storm Water Quality
81. Any proprietary stormwater quality improvement device included to achieve the
required stormwater quality Management Objectives specified in Section 4 of the
Girraween Stormwater Management Plan, must demonstrate only be granted an
Operational Works Approval on the following provisions:
a. A suitably qualified and experienced professional must provide independent
verification that the parameters within the node for the device in MUSIC
modelling have been tested and verified as per Stormwater Australia (2018)
Stormwater Quality Improvement Device Evaluation Protocol. Version 1.2
December 2018 to achieve the predicted outcomes in the MUSIC model for
the development. For the purpose of this condition, the suitably qualified and
experienced professional must be able to demonstrate a minimum 10 years
urban stormwater testing and modelling experience and be verified in writing
by Stormwater Australia as having an appropriate reputation and track record
within the stormwater industry to provide such independent advice.
b. Where testing to achieve the certification of the proprietary stormwater
quality improvement device is from an area with rainfall intensities and
patterns that are statistically inconsistent with the region of the Noosa Shire
that the device is to be installed, and / or the size of the development the
device has been tested on is more than 2500m2 smaller than the
development the device is proposed to service, the following additional
conditions apply:
i. The proprietary stormwater device treatment train must be tested and
re-verified in accordance with the Stormwater Australia (2018)
Stormwater Quality Improvement Device Evaluation Protocol. Version
1.2 December 2018. A suitably qualified and experienced professional,
as verified by Stormwater Australia must use the results from the onsite
testing to re-run the MUSIC node for the proprietary devices and
confirm whether or not the required pollutant reduction efficiencies of
80% reduction in Total Suspended Solids, 60% reduction in Total
Phosphorous and 45% reduction in Total Nitrogen for the overall
development are delivered.
ii. Where the field results and re-run MUSIC node demonstrate the
required pollution reduction efficiencies for the development are not
met, the applicant must implement additional measures to achieve the
required pollution reduction targets. The additional measures must
include, in order of priority, elevated maintenance, and then increased
treatment capacity of the stormwater quality improvement devices.
Following application of additional measures, the system must be
retested in accordance with Stormwater Australia (2018) Stormwater
Quality Improvement Device Evaluation Protocol. Version 1.2
December 2018. Where pollution reduction targets continue to not be
demonstrated the proprietary device must be removed and replaced
with a bio-retention device constructed in accordance with an
Operational Works approval or the applicant must enter into an
agreement with Council to provide improved water quality outcomes
within the catchment area.
Page 15 of 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.