Original source · versioned page text
2020-11-19 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 19 NOVEMBER 2020
Staff Numbers
17. A maximum of 3 staff (including 1 dedicated courtesy bus driver) and 1 manager
for the Entertainment and Dining Business Type 3 Bar use are to be on site at any
one time.
Currency Period
18. The Currency Period for this development approval lapses if the use has not
happened by 19 November 2026, unless an application to extend the currency
period is approved by Council.
B. Include the following advisory note on the development approval:
1. The proposed bar is located in an area that is zoned Low Impact Industry under
the Noosa Plan 2020 and a range of industrial uses are planned to establish that
may generate noise, odour, dust, waste nuisance or the like. These industrial
businesses will not be required to include additional measures to address the
potential impacts from these industrial uses on the bar given that they should
reasonably be expected.
3 PLANNING & ENVIRONMENT COURT APPEAL NO. D144 OF 2019 - APPLICATION FOR
BUILDING WORKS AT 54 SEAVIEW TCE, SUNSHINE BEACH
That Council note the report by the Manager, Development Assessment to the Planning &
Environment Committee Meeting dated 10 November 2020 regarding Planning & Environment
Court Appeal No. D144 of 2019 and agree to settle the appeal generally in accordance with
the following conditions:
PLANNING
When Conditions must be Complied With
1. The applicant must provide a copy of the development approval to the private building
certifier who assesses the subsequent development application for a development
permit for building works for the construction of the Detached House and the associated
deck area and pool.
Approved Plans
2. Development must be undertaken strictly under the approved plans listed in the following
table unless otherwise amended by these conditions.
Drawing No. Revision Drawing Name Date
DD 1.1 A Title Sheet 18-12-18
DD 1.2 A Existing Overlay Site Plan 18-12-18
DD 1.3 A Proposed Site Plan 18-12-18
DD 1.4 A Reference Images 18-12-18
DD 1.5 A DA Eaves and Roof Diagram 18-12-18
DD 1.6 A DA Northern Screen Diagram 18-12-18
DD 1.7 A Lower Ground Floor Plan 18-12-18
DD 1.8 A Ground Floor Plan 18-12-18
DD 1.9 A Level 1 Floor Plan 18-12-18
DD 1.10 A Roof Plan 18-12-18
DD 2.1 A North Elevation 18-12-18
DD 2.2 A South Elevation 18-12-18
DD 2.3 A East Elevation 18-12-18
DD 2.4 A West Elevation 18-12-18
DD 2.5 A West Street Elevation 18-12-18
Page 18 of 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.