Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Development Application - Part 2 of 2 - DTMR Letter, Photos & Plans - OPW12/0511

of 10

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                               Queensland
                                                                               Government

  Our ref         215/01684 P16560-MOM P16780-MOM
  Your ref
                                                                                Department of
  Enquiries       Geoff Prendergast
                                                                                Transport and Main Roads

16 October 2012


Pontoons by Design
16 Avian Street
Kunda Park Qld 4556




Dear Sir


Tidal Works        -
                      Request for comments
Pontoon       -
                  8& 8 Ell, 8 Noosa Parade, Noosaville (Lot3 CPN21841)


Thank you for your letter 2 October 2012 about your proposal to construct a pontoon at the
location mentioned above.


As a concurrence agency, Maritime Safety Queensland has no objection to the proposal

provided the following navigation and marine safety conditions are complied with.

1.   The contractor must build the pontoon according to AAA Design & Development Pty Ltd,

     drawing no: 900-01, 900-02, attached to your letter dated 2 October 2012.

2.    No part of the structure or any ship berthed at this structure is to come closer than 1.5
     metres from the side boundaries of the allocated water space as shown on the

     submitted water allocation plan.


3.   The pontoon and all freestanding piles must be lit and clearly visible to approaching
     vessels. The contractor must position all lighting so it does not cause a risk to the safe

     navigation of other vessels.

4. The applicant or his agent is responsible for the removal of any existing structure above

     or below the waterline, and must contain and remove any debris.        Any pile that needs to
     be removed must be totally extracted.


5.   The ship moored at this pontoon must follow the most direct course from this structure
     to open waters and a similar direct course when returning to this pontoon.




Maritime Safety Queensland                                      Telephone +61 7 3860 3504
Transport Safety Branch                                         Facsimile   +61 7 3860 3571
 MacArthur Avenue East                                          Website     www.msq.qld.gov.au
 Pinkenba Queensland 4008                                       EmaiJ       [email protected]
                                                                ABN 39 407 690 291

Used in these records

About this file

File size
6.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 2 of 2 - DTMR Letter, Photos & Plans - OPW12_0511.pdf · 6.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.