Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Development Application - Part 2 of 2 - DTMR Letter, Photos & Plans - OPW12/0511

of 10

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                           ’~-;"’"   T",~C;~.::jn,!!;;.




       The owner is to ensure that the ship berthed at this structure must maintain
                                                                                    sufficient
6.
                                                                                 local
       under keel clearance at all stages of tide. The ship must comply with any
       restrictions placed on channel depths and draft restrictions.


                                                                   with the Transport
7.     Any ships and equipment you or your agent use must comply
       Operations (Marine Safety) Act 1994, the Transport Operations (Marine Safety)
                                                                           1995.
       Regulation 2004 and the Transport Operations (Marine Pollution) Act

8.         Any ships using this structure must comply with the Transport Operations (Marine
                                                                                     2004.
           Safety) Act 1994 and the Transport Operations (Marine Safety) Regulation

                                                                                 tion of <?!h~r ship~_or
9.         Any ship moored at this pon_too~ ~ust nqt impede the safe n vig_
           restrict safe access to or from neighbouring structures.


10. Any ship berthed, moored or attached to the pontoon must not
                                                                              exceed the following

           sizes:


               Wet Berth                                       Dry Berth
                                7       metres                      N/A
           Length Overall   -




           Beam     -       2.4         metres



11. The contractor mus              cons r   cn~onto’OlTWithin-twe-yeaFS4Fem-tl:le-date...olapproval. If
                                                                                               from the
           construction is not completed, you will need additional or amended comments
           Regional Harbour Master.

                                                                    if all of the above
     aritime Safet Queensland does not need to be further consulted
conditions are met.


The above conditions must be included in your application to the
                                                                            assessment manager.



 This agency will also forward a copy of this letter to the Assessment Manager.




 Yours sincerely




             ~
       -



F-""                                .




 Captain Richard C Johnson
 Regional Harbour Master (Brisbane)




                                                                                                  Page 2 of2

Used in these records

About this file

File size
6.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 2 of 2 - DTMR Letter, Photos & Plans - OPW12_0511.pdf · 6.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.