Original source · versioned page text
Meeting papers
60
Measure: Average seconds of “wait” Measure: Average processing time –
time in phone queue 50
10-day plumbing applications
15
Purpose: Service timeliness / capacity Purpose: Service timeliness / Level of
to respond 40 activity
Commentary: Average wait this Commentary: The Building and
30
quarter has improved each month as Plumbing branch has filled the vacant 10
stability and competency improves plumbing inspector position in June
20
within the Customer Service team reflecting a decrease in application
10 processing timeframe results for June. 5
0
July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June
0
2022/23 2021/22 2020/21 Aug Sept Oct Nov Dec Jan Feb Mar Apr May June
July
Our Finances
Measure: Percentage of building 100%
information requests completed within
Measure: Investment return 0.25% 1.0%
statutory timeframes 80%
above benchmark (USB Bank Bill Index)
Purpose: Service timeliness
Noosa Council Annual Report 2022 - 2023
Purpose: Performance of invested 0.8%
Commentary: A downturn in
60% ratepayer funds
application numbers has contributed
Commentary: Interest rates and long- 0.6%
to reduced processing timeframes
40%
term bond rates continue to rise and as
such Council has invested surplus cash
0.4%
into higher yielding term deposits to
20%
maximise returns on its cash holdings.
0.2%
Council has consistently achieved
0%
returns above target (0.25% above
July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June 0.0%
the Bloomberg bond rate June 2023:
July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June
2022/23 2021/22 2020/21
3.82%), except for February which fell
below target due to the timing of cash
receipts from the January rates issue.
Measure: Number of planning 80
applications decided within statutory 15%
70 Measure: Rate arrears ratio <5%
timeframes
60 Purpose: Measures the efficiency
Purpose: Service timeliness
of Council’s collection of rates and
Commentary: This quarter figures 50
charges 10%
indicate that the number of planning 40
Commentary: Rates arrears are in
applications lodged and decided
30 line with performance for the previous
outside the decision timeframes
20
6 and 12 monthly cycles. Where
has remained similar to the previous
appropriate, recovery action will be 5%
quarter. 10
taken.
0
MCU Reconfiguration Op Works Op Works (Veg) DBW RAP Total
0%
Not decided June (decided) April (decided) May (decided)
July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June
162 163
Page 443 of 518
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (43d079c065.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.