a. Provide action plan prepared by a suitably qualified and registered engineer to
address all issues related to groundwater and Acid Sulfate Soil management for
the underground excavation and construction works, particularly during adverse
conditions (eg encountering acid sulfate soil, flooding, high water table).
b. Details for the dewatering measures during the excavation and back filling works
associated with works below ground level, including identifying any requirement
for any silt settlement tank and/or silt separator during the construction, and taking
into consideration the potential of adverse weather conditions and high water
table.
Issue
The submitted plans do not indicate any proposed bicycle facilities on the site.
Information Required
6. Provide information regarding any proposed bicycle facilities (eg bike racks) on the site.
Water Quality
Issue
Stormwater harvesting
Information Required
7. Condition 32 of MCU19/0089 and the MUSIC model submitted with the application
require 15kL of roof water harvesting tanks to be provided and plumbed for indoor non-
potable and outdoor use. Clarify whether the tanks will be detailed as above-ground
tanks with the BA or below ground tanks with this OPW? If above-ground, identify the
available space for the tanks and how they will connect to the surface drainage system.
If below-ground, provide full details so they can be approved with this OPW application
Also, show the integration of the tanks into the landscaping works.
Issue
Stormwater quality treatment and bioretention design - The site is very level-constrained due
to low surface levels and high (tidal) tailwater levels. These constraints are incompatible with
the adopted pit-and-pipe approach to conveying runoff to the bioretention basins. The OPW
drawings show the issues being exacerbated by lower outlet levels and greater level
differences between pavement and bio surface levels than presented at the MCU.
Information Required
8. Provide a revised design for the stormwater quality treatment system at the site which
addresses the following issues which are inconsistent with the Bioretention Technical
Design Guidelines (Water by Design, 2012):
a. Revise the design levels of the bioretention devices such that the controlling level
for the saturated zone sits within the transition layer and not at the base of the filter
media
b. Revise the design levels of the bioretention devices such that the base of the filter
media is above HAT. In the absence of tidal data for Weyba Creek, levels should
be based on the secondary port at Munna Pt.
c. Revise the design levels of the bioretention devices such that level differences
between the bioretention surface and adjacent pavement is <500mm.
d. Revise the flush grates specified for the bioretention devices for raised grates or
domed grates.
Page 3 of 5
Document Set ID: 21164971
Version: 2, Version Date: 28/07/2020 Print Date: 28 July 2020, 3:43 PM