Noosa Council documents
b. Longitudinal cross-sections for the three proposed driveways, prepared by suitably
qualified engineer, to demonstrate that a standard passenger car (B99) and AV
fuel tanker can entre and exit the development site without scraping the driveway
or the road surface, or bottoming down.
Issue
Required frontage works due to the development works.
Information Required
2. Provide or amend engineering plans to include the following details:
a. Relocating the existing large directional sign in accordance with the specifications
of DTMR that achieve acceptable clearance from existing and proposed
driveways.
b. Removal of the redundant existing driveways and reinstalment of the road verge,
pathway and kerb line to match existing and/or proposed new works.
c. Linemarking and parking signage, where required, to reinstate the two removed
on- street parking spaces.
Issue
Driveways’ clearances from existing and proposed public services.
Information Required
3. Confirm that edge of driveways comply with the normally required clearance of 1.0m
from existing and proposed public services (eg stormwater pit’s inlet lentil, power poles,
Telstra pits, water metres). Where the clearance is less than 1.0m, consultation and
written endorsement is required from the relevant authority.
Issue
Traffic management on the site during fuel delivery operation.
Information Required
4. Provide a site specific traffic management plan for the site during the fuel delivery
operation that include/address but not limited to the following:
a. Indicate on the plan the location of the fuel tanker (AV), fuel supplying points and
any required traffic control devices during the fuel delivery operation.
b. Identify the number of bowsers to be out of use during the fuel delivery.
c. Demonstrate that no obstruction to the entry into, and traffic circulation within, the
site during fuel delivery, particularly in relation to ensuring no impact on traffic flows
on the local roads (eg Mary Street).
Issue
Details are required regarding earthworks on site particularly the works associated with
removal of the old fuel tanks, the installation of the new fuel tanks and the construction of any
proposed underground tanks or structures, especially for underground works during high
water table and adverse conditions.
Information Required
5. Provide information in relation to the proposed earthworks on the site that
include/address but not limited to the following:
Page 2 of 5
Document Set ID: 21164971
Version: 2, Version Date: 28/07/2020 Print Date: 28 July 2020, 3:43 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.