Skip to the record
Accept no substitutions.

Council archive · source document

04/5743 - Change to development application [As Published] · 132004.5743.02

of 13

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 

Site Control

Site control measures are to be followed to prevent erosion and sediment
export from leaving the site. A plan detailing the methods of control may be
required by council,

Noise emission from mechanical equipments shall comply with the local
council's Local Law No. 12.

In the instance of demolition, a waste management plan may be required by
council.

During the course of construction, property boundary fences are to be
maintained and replaced if necessary.

Energy Efficiency Requirements
po 50mm Anticon insulation to be installed below roofing.
eee he setae ee R2.5 Polywoo! ceiling insulation batts to be installed in roof space.
ven Vapour permeable RFL to all exterior framed walls.
Bs A Nf er sete man ey ase ne ene mane ae ee ee ae Ra Meet AY orcas fon oh ea brag tee} S dae au eer Mpg at sg gra el Scat nah ae MMM SS SSS Ly een itp Cy Pe tS ca Whee geist pa aa TEP UN Eps gs Say ARDS qi Vg 1A ae a ae Rae ne eee ee cece SR SS R15 wall batts to all exterior framed walls.

 

Te rats tr a eR TO eT eS a ESE ee eee and where glazed to be fitted with Pilkington ‘Evergreen’ glass.
Sea ea ea ee Ser peered ere ae AN ee ae a a = All exhaust fans to conditioned spaces to be fitted with a self closing damper.

 

 

 

iene Hot water system shall be fitted with a heat trap within 1m of the outlet of the
ny ee sme Mm ten eS AN Bs heater and before the first branch.

 

office

_— al gs Stormwater, Sewer and Water Supply
wii = ae ee e 10° Si Roof & surface stormwater to be disposed of in accordance with council

 

 

 

2,832

 

 

Ne eal —— fequirements.

 

 

 

 

 

 

 

 

eeu chants Ss SA aa The site shall be connected to coucil's existing sewerage reticulating systems

Se ee c a jp and constructed in accordance with council standards & requirements. ——
ay aa ear a 6 ea soa és re The site shall be connected to council's existing town water supply and |

és ay S| constructed rainwater tanks are to be provided as per council requirements.

 

 

 

 

 

700 N
K

 

 

 

 

 

 

 

|
SI ‘ony living balcony General Notes
)

The builder shall check and verify all dimensions and verify all errors and

 

 

 

|
—= living Fi balcony el

 

 

 

 

 

 

 

 

 

 

anil a ee ase Ss | : Do not scale these drawings.
a == a a ae, = ———— aa ae ae eee ea e Drawings shall not be used for construction purposes until issued by the
ya aia ng ER ; io 3 1s él Architect for construction.
4 & RLis finished slab level.
a entry FL is finished floor level.
3 b 3 i 6 Refer fo Engineering documentation for structural identification.
entry d Fa Ci alcon bed ens 'd media room 8 Refer to Hydraulic Engineer for plumbing design and layout.
8 ol Driveway cross-over and layback to be constructed in accordance with local
wa i = JAS Council regulations and design requirements.
Z LETS or pe Refer to Window and Door Schedule.

Smoke detectors to be installed in accordance with BCA regulations.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

|

\

'
200.)

0

Waterproofing through-out to be applied as per manufacturers specification.
Trusses {o be installed as per manufacturers specification.

Termite protection to be carried out in accordance with Australian Standards
and B.C.A. requirements.

All Windows & Doors to comply with relevant BCA regulations & Australian
Standards.

Balustrading installation and constructionto comply with BCA regulations and
relevant Australian Standards.

Pool fencing and gate construction and ressucitation signs {o be installed to
comply with BCA regulations and relevant Australian Standards.

 

00%,
7
2

change A
proposed new basement
floor level

 

change A
proposed new basement
floor level

 

 

483 | 21
ey

 

carport Ui) carport

 

 

 

carpart

300

Termite Protection

The building shall be protected from subterranean termites by approved
physical and/or chemical barriers in accordance with AS3660.1. The precise
method of protection shall be determined by the owners and/or builder only
after consultation with a licensed pest control operator. This information then
shall be advised to the local government or licensed certifier prior to or at the
time of lodgement of the building permit approval.

Thereafter the owner/s shall ensure that any physical barriers are kept clear
of garden beds or st up, that any chemical barriers remain undisturbed!
and that annual i ions (plus eradication as necessary) are carried out |
throughout the life of the building by a licenced pest control operator in
accordance with AS3660.1.

current level shown dotted
previously approved

 

 

 

section d
section A

 

A 22-05-07 Details for Changes Application and |
re-arrangement of pool layout to unit 2
(refer to Decision Notice Condition 7)
CHANGE A
raising RL of basement level
CHANGE B

eee new front stair arrangement to unit 4

51-5 111 sa ei es Sl CHANGE C
o aa ane additional visitor carpark

SS re CHANGE D

new stair to side of buildings.
CHANGE E

NS replacement of balustrading with full
height screen

CHANGE F |
new stair landing to stair from basement

CHANGE G
reduction In size of reflection ponds level 1
Z Sas ee CHANGE H

a unit 4, level 2, living room door to bifold.
aI

          

12 mht line

                  

       

 

 

 

it

BT

 

 

 

mn
ini

2.400,

 

PE
nnn
iii)

 

 

 

 

 

 

 

 

 

balcony

: , NV idindesign.com‘au ‘f

 

 

 

 

 

balcony

 

 

 

 

 

 

ill

 

     

 

 

 

 

 

 

 

 

ZA

 

 

 

 

 

 
   

change A
proposed new basement

 

change A
Proposed new basement
floor level

 

 

 

 

 

 

 

 

 

 

current level shown dotted
previously approved

 

SS
SS

 

section B

Will Franklin
[email protected]

Documentation

David Watson |
[email protected]

Job No

JJ.61.04

 

 

 

Used in these records

About this file

File size
14.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

04_5743 - Change to development application [As Published].pdf · 14.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.