19553-2 Response to Information Request OPW20-0051
Attached to the e-mail 19553 - 125 Lake Macdonald Drive - Response to information request - OPW20/0051 - Email 1 of 2.
4. Building pad levels have been added to drawing 19553-C1100 and confirm compliance with condition 35, ie above 1% AEP. 5. Building envelopes have been added to drawing 19553-C1100 – lot 8 building envelop has been amended to ensure it is above the dam top of embankment. 6. Lot 8 Building envelop has been amended so it does not encroach into the enlarged dam. Note an additional building pad has been added for a storage shed on this lot. Issue Condition 7 of DA approval RAL19/0018 requires that: “A plan of the subdivision overlaid on a current aerial photo must be prepared by a registered cadastral surveyor and submitted to Council prior to the issue of an operational works approval.” Information Required 7. Provide a plan that complies with the requirements of condition 7 of DA approval RAL19/0018. Response 7. A current aerial photo has been added to the plan of subdivision drawing 19553-C1002. A letter certifying this plan has been provided by the Surveyor and accompanies this response. Issue Conditions 11 and 26 of DA approval RAL19/0018 require that a “site-specific geotechnical investigation for each approved lot” is prepared, including but not limited to information on the location of the effluent disposal area. Information Required 8. Provide a geotechnical report that complies with the requirements of conditions 11 and 26 of DA approval RAL19/0018. Response Individual geotechnical reports for each lot are attached to this response . We also provide a copy of the effluent disposal report for the site which identifies the areas for disposal for each lot/building pad. Issue Conditions 12d. and 12f. of DA approval RAL19/0018 require that the operational works application includes details for: “street lighting, signage, linemarking and underground services”; and “maintenance of suitable access (pedestrian and vehicle) to 21 Wilgee Court during the construction phase of the works”, respectively. Information Required 9. Provide detailed plans that comply with the requirements of conditions 12d. and 12f. of DA approval RAL19/0018. Response
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.