19553-2 Response to Information Request OPW20-0051

Attached to the e-mail 19553 - 125 Lake Macdonald Drive - Response to information request - OPW20/0051 - Email 1 of 2.

of 6

Page text shows just the words. Original shows the document exactly as it was published.

4. Building pad levels have been added to drawing 19553-C1100 and confirm compliance
with condition 35, ie above 1% AEP.
5. Building envelopes have been added to drawing 19553-C1100 – lot 8 building envelop
has been amended to ensure it is above the dam top of embankment.
6. Lot 8 Building envelop has been amended so it does not encroach into the enlarged
dam. Note an additional building pad has been added for a storage shed on this lot.

Issue
Condition 7 of DA approval RAL19/0018 requires that: “A plan of the subdivision
overlaid on a current aerial photo must be prepared by a registered cadastral surveyor and
submitted to Council prior to the issue of an operational works approval.”
Information Required
7. Provide a plan that complies with the requirements of condition 7 of DA approval
RAL19/0018.
Response
7. A current aerial photo has been added to the plan of subdivision drawing 19553-C1002.
A letter certifying this plan has been provided by the Surveyor and accompanies this
response.

Issue
Conditions 11 and 26 of DA approval RAL19/0018 require that a “site-specific
geotechnical investigation for each approved lot” is prepared, including but not limited to
information on the location of the effluent disposal area.
Information Required
8. Provide a geotechnical report that complies with the requirements of conditions 11 and
26 of DA approval RAL19/0018.
Response
Individual geotechnical reports for each lot are attached to this response . We also provide
a copy of the effluent disposal report for the site which identifies the areas for disposal for
each lot/building pad.


Issue
Conditions 12d. and 12f. of DA approval RAL19/0018 require that the operational works
application includes details for: “street lighting, signage, linemarking and underground
services”; and “maintenance of suitable access (pedestrian and vehicle) to 21 Wilgee
Court during the construction phase of the works”, respectively.
Information Required
9. Provide detailed plans that comply with the requirements of conditions 12d. and 12f. of
DA approval RAL19/0018.
Response
Log in to download the original file

19553-2 Response to Information Request OPW20-0051.pdf · 357 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.