19553-2 Response to Information Request OPW20-0051
Attached to the e-mail 19553 - 125 Lake Macdonald Drive - Response to information request - OPW20/0051 - Email 1 of 2.
9. Streetlighting and underground services are shown on the electrical and NBN drawings accompanying this response. Signage and linemarking are shown on the civil drawings however we believe that no intersection markings or signage is necessary at the intersection of Wilgee Court and Cordwood Drive. A note has been added to the drawings to state that access to the existing house at 21 Wilgee Court is to be maintained at all times. It should be noted that the existing concrete driveway is located within the future verge area of the Wilgee Court extension so this can generally be retained until the new road is completed. A temporary connection between the driveway and Wilgee Court will be provided as necessary during construction of the road. Issue Condition 13 of DA approval RAL19/0018 requires that the operational works application includes details for “a new intersection must be constructed joining proposed Road 1 with Lake MacDonald Drive.” Information Required 10. Provide detailed plans that comply with the requirements of condition 13 of DA approval RAL19/0018, specifically with regards to signage, linemarking and services (underground and overhead). Response 10. Linemarking and signage details for the intersection of Road 1 and Lake Macdonald Drive have been added to drawing 19553 – C1208. Lighting details have been provided on the electrical plans. Issue Condition 17 of DA approval RAL19/0018 requires that the operational works application includes details for concrete bin pads. Information Required 11. Provide detailed plans that comply with the requirements of condition 17 of DA approval RAL19/0018. Response 11. Concrete Bin pads have been added to the drawings – refer 19553-C1200 Issue Condition 22 of DA approval RAL19/0018 requires drainage easements over all flowpaths conveying discharge from roads. Information Request 12. Amend the engineering plans and provide supporting calculations to show drainage easements over the 1%AEP flow width for all stormwater discharges from new or proposed roads onto the new lots. Additional Easements are considered necessary for Lot 1, Lot 2, Lot 3, Lot 9, Lot 15 and Lot 16. Response
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.