Original source · versioned page text
19553-2 Response to Information Request OPW20-0051
Attached to the e-mail 19553 - 125 Lake Macdonald Drive - Response to information request - OPW20/0051 - Email 1 of 2.
12. Amended plan 19553-DG-CAT shows the location of easements over the 1%AEP flow paths for all stormwater discharges from new and proposed roads onto the new lots. The flow widths have been determined from the previous flood modelling undertaken for the site plus an allowance of 3m width each side of the extent of flow. Issue No information has been provided to demonstrate compliance with conditions 39, 40, 43, 44 and 45 of DA approval RAL19/0018. Information Required 13. Advise if compliance with the conditions 39, 40, 43, 44 and 45 of DA approval RAL19/0018 will be undertaken by separate application for operational works or if the current application will be amended to include compliance with the afore mentioned conditions. Response 13. Landscaping plans are attached to this response and we ask that these be assessed as part of this application. Issue Condition 52 of DA approval RAL19/0018 requires that the applicant submits “any proposed landscaping and/or rehabilitation plans to Energex for approval.” Council acknowledges that a copy of the proposed civil works plans has been submitted to Energex, which did not include landscaping or rehabilitation information. Information Required 14. Provide evidence of compliance with condition 52 of DA approval RAL19/0018. Response 14. Energex have no objections to the civil works proposed – refer attached correspondence. A copy of the landscaping and rehabilitation plans have been sent to Energex and we await their response. Issue Advisory note 8 of DA approval RAL19/0018, requires a preliminary Construction Management Plan to be submitted with the Operational Works application. Information Required 15. Provide a preliminary Construction Management Plan in accordance with the requirements of advisory note 8 of DA approval RAL19/0018. Response 15. Preliminary Construction Management Plan attached. A more detailed plan will be provided prior to the prestart meeting by the appointed contractor. Issue The submitted plans indicate 1 in 2 cut and fill batters on road reserve.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.