19553-2 Response to Information Request OPW20-0051

Attached to the e-mail 19553 - 125 Lake Macdonald Drive - Response to information request - OPW20/0051 - Email 1 of 2.

of 6

Page text shows just the words. Original shows the document exactly as it was published.

12. Amended plan 19553-DG-CAT shows the location of easements over the 1%AEP flow
paths for all stormwater discharges from new and proposed roads onto the new lots. The
flow widths have been determined from the previous flood modelling undertaken for the
site plus an allowance of 3m width each side of the extent of flow.

Issue
No information has been provided to demonstrate compliance with conditions 39, 40, 43,
44 and 45 of DA approval RAL19/0018.
Information Required
13. Advise if compliance with the conditions 39, 40, 43, 44 and 45 of DA approval
RAL19/0018 will be undertaken by separate application for operational works or if the
current application will be amended to include compliance with the afore mentioned
conditions.
Response
13. Landscaping plans are attached to this response and we ask that these be assessed
as part of this application.

Issue
Condition 52 of DA approval RAL19/0018 requires that the applicant submits “any
proposed landscaping and/or rehabilitation plans to Energex for approval.”
Council acknowledges that a copy of the proposed civil works plans has been submitted to
Energex, which did not include landscaping or rehabilitation information.
Information Required
14. Provide evidence of compliance with condition 52 of DA approval RAL19/0018.
Response
14. Energex have no objections to the civil works proposed – refer attached
correspondence. A copy of the landscaping and rehabilitation plans have been sent to
Energex and we await their response.

Issue
Advisory note 8 of DA approval RAL19/0018, requires a preliminary Construction
Management Plan to be submitted with the Operational Works application.
Information Required
15. Provide a preliminary Construction Management Plan in accordance with the
requirements of advisory note 8 of DA approval RAL19/0018.
Response
15. Preliminary Construction Management Plan attached. A more detailed plan will be
provided prior to the prestart meeting by the appointed contractor.

Issue
The submitted plans indicate 1 in 2 cut and fill batters on road reserve.
Log in to download the original file

19553-2 Response to Information Request OPW20-0051.pdf · 357 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.