Minor Change Report MCU19 0008 02 [As Published] · MCU19/0008.02
2. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
100 DA-6 Site Plan prepared by Robinson Architects 06/04/2023
105 DA-6 Lower Ground Plan prepared by Robinson 06/04/2023
Architects
106 DA-6 Ground Floor Plan prepared by Robinson 06/04/2023
Architects
107 DA-6 First Floor Plan prepared by Robinson 06/04/2023
Architects
108 DA-6 Roof Plan prepared by Robinson Architects 06/04/2023
205 DA-6 North Elevation prepared by Robinson 06/04/2023
Architects
206 DA-6 East Elevation prepared by Robinson 06/04/2023
Architects
207 DA-6 South Elevation prepared by Robinson 06/04/2023
Architects
208 DA-6 West Elevation prepared by Robinson 06/04/2023
Architects
305 DA-6 Section SO1 prepared by Robinson 06/04/2023
Architects
306 DA-6 Section SO2 prepared by Robinson 06/04/2023
Architects
307 DA-6 Section SO3 prepared by Robinson 06/04/2023
Architects
3. The maximum height of the development must be in accordance with the approved plans
and not exceed 8 metres above the natural ground level.
5. The dwelling must be backfilled in accordance with the approved plans.
6. No structures or buildings are to be located within the 15-metre setback to the eastern
boundary, except where uncovered, unenclosed cantilevered balconies that do not extend
greater than 3 metres seaward of the coastal building line, or as otherwise detailed on
Approved Plan 108-DA6.
14. A sealed access driveway must be provided from Arakoon Crescent to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance with
an Operational Works approval and must be generally in accordance with SCG Consulting’s
Driveway & Access Plan (32288-OW2.1) dated December 2022.
17. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with SCG Consulting’s
Stormwater Management Plan (32288-SW1.1) dated December 2022.
Page 13 of 14
Document Set ID: 22356920
Version: 9, Version Date: 25/05/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report MCU19 0008 02 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.