Minor Change Report MCU19 0008 02 [As Published] · MCU19/0008.02
19. All earthworks must be undertaken generally in accordance with SCG Consulting’s
Earthworks Plan (32288-OW3.1) dated February 2023. All earthworks and associated
retaining structures/batters, both above and below ground level, both temporary and
permanent, must be contained entirely within the subject site unless written permission from
the respective landowner(s) is provided to Council.
25. All works must be carried out in accordance with the recommendations contained in Pacific
Geotech’s Geotechnical Stability Assessment: Version 3 (PG-2096) dated March 2023.
26. Certification must be submitted to Council from a suitably qualified person* which certifies
that the development has been constructed in accordance with the recommendations
contained in Pacific Geotech’s Geotechnical Stability Assessment: Version 3 (PG-2096)
dated March 2023. *(Refer to advisory note)
C. Delete condition 27.
Page 14 of 14
Document Set ID: 22356920
Version: 9, Version Date: 25/05/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report MCU19 0008 02 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.