Planning Report
Performance Outcomes Acceptable Outcomes
PO13 AO13.1 Complies
Each lot is provided with safe and convenient Vehicular access for the development is Vehicular access is from
vehicle access. consistent with the function and design of Currawong Crescent via
the road it takes access from. an existing crossover.
AO13.2 Not applicable.
Development does not require new or
changed access to a state-controlled road
that is a limited access road unless in
accordance with the limited access policy
for the state-controlled road.
AO13.3 Not applicable – no
Access easements are in appropriate access easement
locations for safe access and egress, and required.
supply appropriate widths and levels of
service for the number of vehicles that will
utilise them as per the requirements of
Council’s Planning Scheme Policy PSP6
Engineering design standards – Roads,
drainage and earthworks.
Editor's note- Reference should be made to
the Queensland Government's Development
Assessment Mapping System to confirm
which are state-controlled roads or limited
access roads.
Movement Network
Traffic No acceptable outcome provided. Complies
PO14 Only one new lot is
Traffic generated by the development is within proposed which will have
the acceptable capacity of external roads and no adverse impact on the
does not have an adverse impact upon the functioning of the road
functioning of the road network. network.
Editor’s Note— Further detail on traffic and the
road network is addressed in Part 9.4.8
Transport Code
Roads and Pathways AO15.1 Not applicable – no new
PO15 Where involving the construction of a new roads or pathways.
Development involving the creation of new road, road planning and design supports the
roads and pathways ensures infrastructure— hierarchy and functional aspects identified
(a) provides convenient, safe and efficient in Council’s Planning Scheme Policy PSP6
movement for all modes of transport on Engineering design standards – Roads,
between land use activities; drainage and earthworks.
(b) prioritises pedestrian movement and Editor’s Note— Further detail on road and
bicycle use over vehicle movements; pathway networks is provided in Part
(c) facilitates efficient, safe and accessible bus 9.4.8 Transport Code
services that connect to existing and future AO15.2
public passenger transport facilities; The street layout is generally rectilinear and
(d) provides through roads and minimises the does not rely on culs-de-sac, or where the
use of culs-de-sac; use of a cul-de-sac is unavoidable because
of the natural features of the site, it does
Planning Report | 29 Currawong Crescent, Peregian Beach | 19/10/2021 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.