Skip to the record
Every meeting, every word.

Original source · versioned page text

Planning Report

of 25

Page text shows just the words. Original shows the document exactly as it was published.

 Performance Outcomes                                 Acceptable Outcomes
 (e) minimises the extent of earthworks               not exceed a length of 200 metres.
     required by being sympathetic to the             AO15.3
     terrain;                                         Pathways and pedestrian routes are
 (f) allows for unimpeded and                         planned to provide clear, safe connections
     practical access to each proposed lot; and       between residential, open space, transit
 (g) provides for mature street trees.                stops and retail areas, and are located
                                                      along, or are visible from, streets or other
                                                      public spaces.
                                                      AO15.4
                                                      Sufficient space and soil depth is provided
                                                      for the planting of street trees for shade,
                                                      amenity and habitat purposes.
 PO17                                                 No acceptable outcome provided.                Not applicable.
 Development on land within activity centres
 with     active   frontages     are      provided
 with access from      a     rear      lane     or
 other access streets to reduce potential
 conflicts with pedestrians and cyclists.


 Open Space Network
 PO18                                                 AO18.1                                         Not applicable – only one
 Development provides for parks, drainage             Active parkland or open space which links to   new lot is proposed.
 reserves and open space infrastructure that:-        active parkland is provided in accordance
 (a) provides for a range of passive and active       with the Council’s infrastructure network
     recreation settings, offering a range of         planning;
     informal and formal experiences to the           OR
     community;                                       AO18.2
 (b) accommodates adequate facilities to meet         Park contributions are paid in accordance
     the needs of the community and is                with the applicable infrastructure
     designed to maximise use by the                  instrument.
     community it serves;                             AO18.3
 (c) provides opportunities for all age groups        Land intended for public open
     and levels of mobility;                          space complements existing adjacent and
 (d) is well distributed and contributes to the       surrounding open space areas and physical
     legibility and character of the specific town,   linkages to these areas are provided.
     village or locality;                             AO18.4
 (e) creates attractive settings and focal points     Open space is provided adjacent to
     for the community, designed as attractive        waterways, with roads servicing the linear
     and enjoyable, functional and safe places to     parkland and lots located on the opposite
     meet and recreate;                               side of the road to the waterways.
 (f) benefits the amenity of adjoining land uses;     AO18.5
 (g) facilitates the retention and protection         A park has direct road frontages of a
     of ecologically important areas, wetlands,       minimum of 25% of the
     waterways, drainage lines and native             total allotment boundary of the park to
     habitat       areas,     their     associated    provide physical access and visibility.
     buffers, ecological linkages and other           AO18.6
     natural and cultural features;                   Public open space has good connectivity for
 (h) incorporates appropriate measures for            users via pedestrian and cycle paths.
     stormwater and flood management;                 AO18.7
 (i) is cost effective to maintain; and               Landscaping is designed to create
                                                      aesthetically pleasing open space areas and
Planning Report | 29 Currawong Crescent, Peregian Beach | 19/10/2021                                                   21
Log in to download the original file

Planning Report.pdf · 2.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.