 Performance Outcomes                                Acceptable Outcomes
 (j) is dedicated as public land in the early        to suit the type, setting and purpose of the
     stages of the subdivision.                      particular park.
                                                     AO18.8
                                                     Active parkland in all areas other than
                                                     the Low impact industry zone and Medium
                                                     impact industry zone will contain
                                                     embellishment in accordance with the Local
                                                     Government Infrastructure Plan in Part 4
                                                     such as:
                                                     (a) children’s play facilities catering for
                                                          various ages including a soft fall surface
                                                          where required and a shade cover over
                                                          play equipment;
                                                     (b) seating;
                                                     (c) picnic table/s with seats; and
                                                     (d) landscaping.
                                                     Editor’s Note— Further detail on
                                                     Landscaping is addressed in
                                                     Part 9.4.5 Landscaping Code
 PO19                                                AO19.1                                            Not applicable.
 Land provided for active recreation areas is of a   Active parkland is of a usable shape free of
 physical standard and condition suitable for the    irregular boundaries.
 intended uses and is not subject to physical or     AO19.2
 other constraints including contamination,          Active parkland is located on land that is
 environmental or biophysical constraints or         exclusive of—
 legislative protection that would encumber its      (a) flood inundation below the
 use.                                                     20% AEP (1:5 year ARI level);
                                                     (b) land affected by stormwater or
                                                          overland flow discharge from adjacent
                                                          allotments;
                                                     (c) drainage reserves and detention basins,
                                                          which cannot be shown to safely and
                                                          effectively contribute to the network of
                                                          parks and open space areas;
                                                     (d) land with a slope, or subject to cut or
                                                          fill with a batter slope, that exceeds
                                                          a slope of 15%;
                                                     (e) areas of land less than 15 metres wide,
                                                          such as access and service and utility
                                                          easements;
                                                     (f) land required to serve primarily as a
                                                          buffer area to any existing
                                                          development or major transport
                                                          corridor; and
                                                     (g) power easements.
                                                     AO19.3
                                                     At least 10% of the total open space
                                                     provision for active parkland is exclusive of
                                                     flood inundation below the 1% AEP (1:100
                                                     year ARI level or the highest recorded flood
                                                     level), whichever is the greatest.

Planning Report | 29 Currawong Crescent, Peregian Beach | 19/10/2021                                                     22
Log in to download the original file

Planning Report.pdf · 2.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.