502746 Crawford - Amended Contract Plans 20220705
Attached to the e-mail Response to Information Request OPW22/0145 - 26 Dayspring St.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Last Published: Tuesday, 5 July 2022 2:05 PM
REFER TO SHEET 1 (COVER SHEET) FOR 880 PROVIDE AND INSTALL 3 PHASE REVERSE CYCLE AIR
ALL BUILDING INFORMATION REGARDING: CONDITIONING SYSTEM. NUMBER AND POSITIONING OF
- SUSTAINABILITY REQUIREMENTS OUTLETS AND THE FINAL LOCATION OF THE RETURN AIR
- SITE CLASSIFICATION GRILLE WILL BE DETERMINED ON SITE BY THE AIR
- GENERAL BUILDING INFORMATION CONDITIONING CONTRACTOR AND IS SUBJECT TO TRUSS
CDP CHARGED DOWNPIPE DIRECTED
150 12,020 8,080 LAYOUT AND ANY OTHER CONSTRUCTION CONSTRAINTS.
1,860
TO TANK 3,465 610 2,960 610 1,375 2,410 590 590 1,570 5,920 FRAME MANUFACTURER TO PROVIDE CLEARANCE FOR
SDP STANDARD DOWNPIPE DIRECTED PASSAGE OF FAN COIL UNIT FROM RETURN AIR OPENING TO
TO STORMWATER DISCHARGE 150 75 3,180 Bed 3 75 2,890 Bath 75 1,500 PDR 2 75 530 75 3,470 Bed 4 75 FINAL FAN COIL LOCATION.
Robe
ALL FIRST
FIRE RESISTANT
FLOORPLASTERBOARD
INTERNAL DOORS
TOTO
BEBE 75 1,750 Bath 75 2,640 Hallway 75 4,075 Bed 4 75 ANY PART OF THE FASCIA, GUTTERING OR DOWNPIPE THAT
INSTALLED
2340 BEHIND NOTED
HIGH UNLESS COOKTOP
OTHERWISE. BATH HOB DETAIL IS WITHIN 450mm OF ANY BOUNDARY IS TO BE NON-
1650 DECINA METRO 75 1,750 Shower 75 COMBUSTIBLE IN ACCORDANCE WITH THE NCC.
ALL EXTERIOR STEPS AND LANDINGS BY
OWNER UNLESS NOTED OTHERWISE
FRAME 530 HIGH 75 4,155 Hallway 4,460 Stairwell 75 ALL EXTERIOR SLABS TO BE GRADED BY CONCRETER TO
SCALE 1:100 ACHIEVE APPROX. 1:100 FALL TO OUTSIDE EDGE WITH
ALL FIRST FLOOR BULKHEAD AND SQUARE 150 75 2,820 WIR 75 430 75 2,295 WIL 75 6,505 Hallway 75 7,600 Master Suite 75 MAXIMUM CROSSFALL OF 30mm OVER ENTIRE SLAB.
SET OPENING FRAMES TO BE 2340 ABOVE V
FFL UNLESS NOTED OTHERWISE VALLEY NOT AT 45 DEG
REFER TO WINDOW & DOOR SCHEDULES ADJUST ROOF PITCH TO SUIT
FOR FULL DETAILS OF ALL WINDOWS AND
DOORS
22.5º ROOF PITCH
A
FINAL WINDOW AND EXTERIOR DOOR
8
LOCATIONS MAY BE ADJUSTED ON SITE
TO SUIT BRICKWORK GAUGE W16 W15
150
ALL STAIR TREADS TO PROVIDE A A1206 A1006 SFS0624
150
150
150
150
150
150
150
MINIMUM SLIP RESISTANCE TO MEET NCC SDP SDP
REQUIREMENTS
740
1854
75 1,860 Bath 75
75
75 1,810 Bath 75
1,810 PDR 2 75
75 1,810 Robe 75
75
75
500
830
PROVIDE EXPOSURE GRADE BRICKS AND W14
920
1650 DECINA
22.5º ROOF PITCH
22.5º ROOF PITCH
2 x SLIDING
(MIRROR)
MORTAR TO ALL EXTERIOR WALLS W18SL-CC
S/O 1455
ROBE
METRO
PDR 2
BEDDING
MORTAR
BATH
AA1030x1810
2,905 Bed 4
0
PROVIDE ENERGY EFFICIENT LIGHTING TO
2,815 Bath
5mm TILE
BED 4
1,810
A MINIMUM 80% OF TOTAL FIXED
W13
SETDOWN
#
450
ARTIFICIAL LIGHTING AS REQUIRED BY
AFA1424
4,305
3,965 Bed 3
820 820
MP4.1 - (A3) SUSTAINABLE BUILDING
BED 3
2,410
W17
75
1750 MORTAR
Shower
880
Hallway
MAN
1,095
FIRST FLOOR WINDOW OPENINGS TO BE
1,020
1,020
Bed 4
985 165 880
880
BEDDING
820
1200 HIGH TILED SHELF AS HOLE
RESTRICTED AS REQUIRED BY THE NCC
500
PER G-WETA-WALL02 850 690
955
75
75
F1030x450
UNLESS NOTED OTHERWISE A 1100 SS
STAIRWELL
165
75
75
ALL ROOMS ARE REFERENCED
Hallway
Stairwell
D B 2R+G = 612 (OK)
1,100
W12
1,100
820
AS FOLLOWS:
450
UP
2,295 Hallway
C 810
RISERS = 16 @ 186mm AA1030x1570 SDP
1200 SS GOINGS = 15 @ 240mm 4,460 SPREADER
75
350
75
75
75
75
75
820 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
9,900 Overall
2,050
PROVIDE FLOOR WASTE AND OVERFLOW 1,145
FAN COIL
450
1,100 75
1,100 75
450
WIR
16
525
Master Suite
UNIT
WIL
Recess / Hallway
SPITTERS TO UPPER FLOOR TANKED 450 W11
1,100
Hallway
450 BALUSTRADE AS PER
1,570 Robe 75 525 75 1,195
RETURN AIR
9,750
FH FH 900mm H TILED SHELF
1,120
1,120
(B-ROBE-0001)
WIR
V
WIL
BALCONIES WHERE APPLICABLE AS PER:
920
GRILLE COLOUR SELECTION SIMILAR TO DETAIL
1,795
450
450
- G-FACA-BALC02 (PFC/BRICKWORK) FH
560
FFF/AFA1460x2410
G-WETA-WALL02
3,310 Master Suite
75 525 75
- G-FRAM-BALC001 BULKHEAD OVER
3,760 Master Suite
75
75
75
(LIGHTWEIGHT CLADDING)
6,470 Activites / Hallway
120
365
4,710 WIR / Master Suite
530
2,170 Shower 75
75
600
3,460
830
1000 SILL 2190 HEAD
1,265
V
V
2,410
W10
POSH SOLUS 1700
PROVIDE NON CORROSIVE BRICK TIES IN BULKHEAD OVER
LIEU OF STANDARD DUE TO PROXIMITY TO MASTER
75
1500 SS
1,500
SALTWATER.
780
SETDOWN
5mm TILE
2 x SLIDING
2170
SUITE
820
(MIRROR)
S/O 1255
ROBE
BALCONY
4,235 Activites / Recess
4,230 Balcony
PROVIDE R4 RATING TO STRUCTURAL
3,927
(FC)
STEEL DUE TO PROXIMITY TO
4,100 Ensuite
FSS2427
960
HOBLESS(B-WETA-SHR001)
FW 1200 HIGH TILED SHELF AS
545 525
SALTWATER.
2,688
ACTIVITIES
D05
900
3,500 Bed 2
PER G-WETA-WALL02 SQUARE SET
295
CORNICE 3,885
75
COLORBOND CAPPING
75
1,855 Ensuite 75
75
BED 2 ENS
1430 SS
150mm SDP
File Location: G:\Queensland\Drafting\Job Files\Job Files 500000\502700 files\502746 - Crawford\Plans\502746 Crawford_AC21.pln
720
#
FLOORWASTE
BALCONY DRY
SIDE OF BALCONY
TO FROG FLAP ON
F/A1460x850
SETDOWN
150 75 1,460 See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.