Decision Notice - Approved by Delegation of Authority OPW24/0172 {As Published}
Plan No. Rev. Plan/Document Name Date
1 “Aerial Plan with Dimensions” 21/10/2024
Prepared by Pivotal Perspective
(AS ANNOTATED IN RED BY COUNCIL)
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 29 October 2026, unless an application to extend the currency period
is approved by Council.
GENERAL CONDITIONS
Engineering
3. A condition report including photographs of the frontage of the site must be completed and
submitted to Council prior to the prestart meeting.
4. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and public liability
documentation. Certificates demonstrating currency of public liability insurance and works
insurance covering the works must be submitted to Council prior to the prestart meeting.
5. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
b. Landscaping works.
6. A Construction Management Plan must be submitted to Council prior to the pre-start meeting
and must specifically address the following:
a. Traffic Management during the construction phase;
b. Appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD);
c. Provision for safe pedestrian access across the frontage of the site both during and
after works have ceased.
7. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
8. The integrity and condition of any existing public or Council infrastructure and services
(above ground and/or underground) must not be adversely affected by the proposed works.
9. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Page 2 of 6
Document Set ID: 23327801
Version: 4, Version Date: 04/11/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority OPW24/0172 {As Published}Related documentApplication case desk ↗
About this file
- File size
- 170 KB (small file)
- File type
No other editions are linked here.