Decision Notice - Approved by Delegation of Authority OPW24/0172 {As Published}
10. All works must be constructed and work procedure undertaken in accordance with:
a. the approved plans/documents and conditions detailed in this Decision Notice;
b. the relevant conditions of the higher order Material Change of Use approval
MCU24/0022 to which this approval relates;
c. all relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines;
d. the latest version of the Healthy Waterways document “Water Sensitive Urban Design
Technical Design Guidelines for South East Queensland” for all water quality devices
to be constructed on site.
Works within Road Reserves
11. No removal of street trees is permitted without Council’s prior written approval.
12. Safe pedestrian access on all streets in the vicinity of the development must be maintained
at all times. Should road closures be necessary to carry out construction works, Council’s
Engineering Officer must be notified prior to the proposed closure and all requirements
complied with.
13. All works must match neatly with existing road and verge features. Additional works beyond
the frontage may be required to provide an acceptable transition to existing road and verge
profiles.
Driveways
14. Driveway crossovers must be constructed generally in accordance Council’s Standard
Drawings RS-049 and RS-050.
15. The verge area must be reinstated to a grassed verge area and must be provided with 100
mm topsoil and grass seed or turf and must be maintained by the developer until established.
The use of pebbles/rocks/gravel on road reserve is not supported by Council.
16. The following must be complied with during the construction of the required
crossover/driveway:
a. the driveway surfacing must consist of either an approved hot mixed asphaltic concrete
or patterned/plain concrete;
b. the driveway must be in accordance with the requirements of AS2890.1 Off-Street Car
Parking for longitudinal and crossfall gradients;
c. the driveway must be constructed so as to not concentrate or direct stormwater runoff
onto neighbouring properties;
d. have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset,
unless a written approval is obtained from Unitywater/Energex/Telstra and submitted
to Council;
e. any stormwater kerb outlet in close proximity to the edge of the new driveway must be
provided with an approved kerb adaptor;
f. any existing kerb sections requiring removal due to the works must be saw-cut and
removed to allow for a smooth and neat finish with the new driveway.
17. Pavement design for privately owned works must be undertaken in accordance with the
relevant standards. Structural integrity of the driveway and car park areas will remain the
responsibility of the property owner/developer.
Stormwater Drainage
18. The constructed driveway must not cause additional ponding on the road formation or the
road reserve.
Page 3 of 6
Document Set ID: 23327801
Version: 4, Version Date: 04/11/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority OPW24/0172 {As Published}Related documentApplication case desk ↗
About this file
- File size
- 170 KB (small file)
- File type
No other editions are linked here.