Appendix A - Response to Noosa Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSpecific Outcome Probable Solution (if code assessment) Comment
S7.8 The provision of bicycle lanes at intersections is
generally in accordance with AUSTROADS Part 14, section
5 and Manual of Uniform Traffic Control Devices (MUTCD)
Part 9.
O8 The development contains a pathway system that S8.1 Subdivision design and layout provides for walking PS8.1 – 8.6 Complies. The original application included a
encourages walking and cycling and provides a safe and cycling routes designed and constructed in accordance Civil Engineering report prepared by RPEQ which was
environment for users, and is-- with— assessed against Sections 2 and 3 of PSP5 Engineering
a) a stable, smooth surface, including across driveways, a) Sections 2 and 3 of PSP5 Engineering Design Standards – Design Standards and Earthworks.
sections and joins; Roads, Drainage and Earthworks;
b) easily maintained; b) AUSTROADS Parts 13 and 14; and It is noted that:
c) of a width and longitudinal gradient to cater for c) The Noosa Cycling and Walking Network Development
projected usage Plan; Sections 2 and 3 of PSP5 Engineering Design
d) inclusive of clear sight-lines for safe use; Standards and Earthworks remain unchanged
e) be free of any obstructions such as fences, signage and AND from 2013 Approval.
bollards. S8.2 If within 1km of the Pathways Network identified in
the Priority Infrastructure Plan in Part 15, the subdivision AUSTROADS Parts 13 and 14 were updated in
design and layout includes pathways— 2017; however, design standards applicable to
a) located in accordance with the Pathways Network this development have not changed.
identified in the Priority Infrastructure Plan; or
b) linking to the Pathways Network identified in the AUSTROADS Part 14 Bicycles was updated in
Priority Infrastructure Plan; 2017; however, design standards applicable to
this development have not changed.
AND
S8.3 Pedestrian routes are planned to provide clear, safe MUTCD unchanged from 2013 Approval.
connections between residential, open space, transit stops
and retail areas, and are located along, or are visible from, Australian Standard 1742.9 was updated in 2018;
streets or other public spaces; however, design standards applicable to this
AND development have not changed.
S8.4 Primary pedestrian routes border the frontages of
residential, public parks and business uses; Australian Standard 1158.3.1:1999 has remained
AND unchanged from 2013 approval.
S8.5 Pedestrian routes through parking lots or at the rear
of lots are avoided; It is considered that the layout is compliant with current
AND Engineering standards for rural residential development.
S8.6 Pedestrian and cycle path infrastructure is designed
JFP Ref: M1775 Page 26