DILGP - Concurrence agency response With conditions - SDA-1215-026793
Attached to the e-mail MCU15/0111 - Concurrence agency response - with conditions.
SDA-1215-026793
No. Conditions Condition timing
(b) The road works must be designed and constructed in
accordance with the Department of Transport and Main
Roads Road Planning Design Manual.
6. Direct access is not permitted between the Cooroy Connection At all times.
Road and the subject site.
Department of Infrastructure, Local Government and Planning Page 6