Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

DILGP - Concurrence agency response With conditions - SDA-1215-026793

Attached to the e-mail MCU15/0111 - Concurrence agency response - with conditions.

of 14

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                                                                   SDA-1215-026793




No.        Conditions                                                     Condition timing
           (b) The road works must be designed and constructed in
               accordance with the Department of Transport and Main
               Roads Road Planning Design Manual.

6.         Direct access is not permitted between the Cooroy Connection   At all times.
           Road and the subject site.




Department of Infrastructure, Local Government and Planning                         Page 6
Log in to download the original file

DILGP - Concurrence agency response With conditions - SDA-1215-026793.pdf · 2.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.