Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

09/1270 - Approved plans/Negotiated Decision Notice [As Published] · 132009.1270

of 16

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
oe
et

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

aa ‘ GN, & cs a, 2009/1270
~~
Yq TERE
Plan No. i Rev. Plan - Prepared by , «-, Date iy
wob01 A Site Calculations. - Soul Space Building | 6 November 2009
Design
WDO02 A Site Plan — Soul Space Building 6 November 2009 |
WDO03 A ‘Site Setback Plan ~ Soul Space Building 6 November 2009:
wooa A Sub Floor Plan - Soul Space Building ; 6 November 2009 |
WD0S - A Lower Floor Plan — Soul Space Building 6 November 2009
WD06- A Lower Floor Setout Plan - Soul Space | 6 6 November 2009
Building
woo7 A Main Floor Plan — Soul Space Building 6 November 2009
WD08 A Main Floor Setout Plan — Soul Space Building 6 November 2009
WDO09 : A Upper Floor Plan - Soul Space Building 6 November 2009 ;
WD10 - A Roof Plan — Soul Space Building ‘ 6 November 2009
/wo1 A Height Check Plan — Soul Space Building | 6 November 2009
; wo12 A Elevations — Soul Space Building | i 6 November 2009
wo14- A Sections — Soul ‘Space Building - ) 6 November 2009
wots A ‘Sections — Soul Space Building 6 November 2009 _|
A Sections — Soul Space Building 6 November 2009 i
A - Sections. - Soul Space Building . Te November 2009
WwD22 : A Landscape Plan & Existing Site Conditions~ 6 November 2009

 

The development shall be-carried out in compliance with. the relevant requirements and

1.

 

| Soul Space Building

provisions of the Plan of Development (No 67).

Relevant Period

3.

The Development Permit for a material change of use lapses if the use has not happened by

25 January 2014, unless an application to extend the currency is approved by Council.

Security Bond

4.

Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be
submitted, to secure performance of ail conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in

respect of enforcing performance of this permit.

2of 14

Used in these records

About this file

File size
865 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1270 - Approved plans_Negotiated Decision Notice [As Published].pdf · 865 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.