09/1270 - Approved plans/Negotiated Decision Notice [As Published] · 132009.1270

of 16

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
2009/1270

 

25.

Construction works undertaken in the vicinity of Counci! water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of Council's infrastructure must be met by
the applicant

Erosion and Sediment Control

26.

28.

29.

30.

Any person acting on this permit shall prevent erosion on the site and the adjoining land and
sediment export from leaving the site. Site contro! measures such as silt fencing, controlled
gravel access to the site and controlled disposal of waste, will be necessary.

In this regard, a plan detailing the methods of controlling erosion and sediment in
accordance with the Healthy Waterways document and fact sheet series titled “Controlling
Stormwater Pollution on your Building Site dated 2006” is required to be submitted with the

‘ application fora Building Works Permit.
Earthworks
. 27,

Filling works required on site shall be carried out in accordance with Council's Planning
Scheme Policy PSP5 ~ Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any natural
stormwater runoff.

Excavation of the site and the construction of .the proposed works_shall not have any
adverse affects on the stability of adjoining buildings and/or structures and/or services and/or
lands. In.this regard a Registered; Professional Engineer Queensland shall supervise the
excavation of the site and the construction of the. new works to determine whether any
additional measures are required to protect the stability of adjoining buildings and/or
structures and/or services and/or lands.

Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Final Building Inspection by the Building Certifier. In this regard any
fences to be replaced shall be clearly shown on the Plans submitted for Building Works
approval. , .

The use of vibratory equipment of any kind is 5 not permitted:to be used (including vibrating
rollers and the use of vibrating installation techniques ‘for sheet piling and other construction
vibrations caused by excavating, earthmoving or demolition machinery or ‘other similar
construction techniques) unless approved and supervised by a Certified Geotechnical
Engineer. Under such-circumstances the operator of such equipment shall at all times
comply with the directions of the Geotechnical engineer and the- reasonable and lawful
directions of Council officers.

Site Stability

31.

32.

33.

A registered Geotechnical Engineer or similar qualified expert shall assess the soil condition
on site, determine the soil classification, establish whether any measures are required to
protect the stability of adjoining buildings and/or structures and/or land, and make
recommendations on the type of foundation system(s) best suited for the proposed

: development. The recommendations of this report shall be incorporated into the design and

construction of the proposed development and the. associated civil works (eg stormwater
drainage disposal, earthworks) and be part of the application. for Building Works.

Should: the recommendations of the geotechnical report require any part of the works
(including excavation, retaining structures, tie backs etc) to be temporarily or permanently
constructed within any adjoining property a letter of authority from the adjoining property
owner shall be obtained prior to the issue of Development Permit for Building Works.

Prior to the Final Building Inspection by the Building Certifier, a certification of the completed

works must be provided by the supervising engineer. The certification(s) shall state that the

completed works, including but not limited to: earthworks, stormwater drainage works, on-
Sof 11

Used in these records

About this file

File size
865 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1270 - Approved plans_Negotiated Decision Notice [As Published].pdf · 865 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.