Council archive · source document
09/1270 - Approved plans/Negotiated Decision Notice [As Published] · 132009.1270
Plans and drawings: the text below has words only, no drawings.
‘ 2009/1270 14. 15. Ajl hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems (LPG or natural). Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) shall not be constructed under overhead electricity transmission lines, or within any easements. Vehicle Access and Car Parking 16. 17. 18. 19. A vehicular access driveway to serve the development shall be constructed from the edge of the existing road formation in the common property area at the front of the site with a maximum width of 4.5m at the property boundary. The driveway shall be designed and certified by a Registered Professional Civil Engineer and constructed in accordance with Council's standards, and to grades that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the footpath without any step or level difference. Should any driveways be constructed to grades that do. not comply with AS/NZS 2890.1-2004, Council will require that the driveway be removed and reconstructed to levels that do comply. Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall. Deleted. Deleted. Roof Water and Stormwater Drainage 20. 21. 22. Roof runoff from the new dwelling shail be directed to a rainwater storage system or tank that is installed to ensure water from the rainwater storage System or tank is -:used for external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and installed in accordance with the Queensland Development Code (QDC) current at the time of building approval, and shall be part of the plumbing application for approval. The location and capacity of the tanks shail be clearly shown on the plans submitted for the Building Works approval. Plans of the ‘drainage design for the site shall be prepared and certified by a suitably qualified Registered Professional Civil Engineer in accordance with Council's standards and requirements and be submitted as part of the application for Building Works. All stormwater drainage (including roof water overflow from the rainwater storage system and overland hard surface runoff) shall be collected and discharged so there is no net increase in stormwater runoff from the site. Subject to the engineer's assessment and design, the stormwater drainage from the site should be discharged into an existing drainage system or/and an infiltration system be constructed within the allotment. The design must also insure that the stormwater disposal from the site will not adversely impact on other properties (including the Common Property) and/or the integrity and the stability of the sand dune. All site stormwater drainage shall be by means of a gravity system. 2 Sewer and Town Water 23. 24. Reticulated water supply and sewerage must be provided to the development and be constructed in accordance with Council’s standards and requirements at no cost to Council. Storm water retention systems and gross pollutant traps must maintain a minimum clearance of 1.5 metres from the Council sewerage inspection opening within the development site. 4of1t
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1270 - Approved plans/Negotiated Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 865 KB (small file)
- File type
No other editions are linked here.