Original source · versioned page text
Annex 9 - Code 7 - Maritime Safety
Attached to the e-mail DA Application - Noosa Oyster Project (2 of 3).
Performance outcomes Acceptable outcomes Response
AO3.4 Development involving the demolition of The works do not include removal of structures.
structures in a navigable waterway, including piling,
ensures the entire structure is removed.
AND
AO3.5 Structures, including all freestanding piles, The works are an oyster reef and are not proposed to
must be appropriately lit and clearly visible to be lit. The size of signage and positioning in
approaching vessels, and reflective tape must be association with the oyster reef patches will be agreed
fitted to all structures to enhance visibility during the with MSQ and placed with MSQ direction.
hours of darkness.
Note: Where necessary, the regional harbour master may require
the installation of aids to navigation on structures.
State Development Assessment Provisions – version 2.6
State code 7: Maritime safety Page 4 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.