Original source · versioned page text
2016-08-09 S&O Agenda Item 8, Attachment 1 - CCIQ Noosa Convention and Cultural Centre Initiative Pre-feasibility Study
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
CCIQ Noosa #3 Noosa Convention & Cultural Centre Initiative
Pre-feasibility Study April 2016
Hall29 Services and Volunteer
1.3.2. Noosa Civic Stage 2, as part of Management to cover both
any negotiation with QIC30 buildings
1.4. In conjunction with an 1.4.14. Superior equipment loading
expanded Noosa Arts Theatre31 facilities, including a Vehicle
(NAT as the Resident Theatre Turntable. Direct vehicle access
Company with Noosa Long to the main stage.
Weekend Festival and having 1.4.15. Walking distance to public
Resident Arts and transport
Entertainment Event status A 1.4.16. Ample parking available but not
recent alternative suggestion, underneath the centre.
first put to the Team in
December 2015, is for the
Noosa Regional Gallery to be re-
located and upgraded - housed
on the ground floor32
1.4.1. Both Tourism Noosa and The
Noosa Wedding Organisation
have requested the inclusion of
a space which could be re-
purposed as required as a wet-
weather Wedding Chapel,
capacity approx. 150.
Expanded opportunities are likely across:
Local Business a. Construction Phase
& Employment Building services for construction
Specialist trades and services for fitout
Economic Supply of specialist equipment across the needs of each centre and
Boost ancillary areas
Upgrade, refit and new construction of commercial premises in the
Junction towards centres opening and attracting new trade
New construction of accommodation properties to meet increased
accommodation needs – high class inventory
b. Operation Phase
Wider range of new job prospects in the Junction commercial precinct
New businesses to occupy current and new commercial space
Opportunity for a return to Noosa style creative designs and products
under the planned new Noosa branding initiative
New jobs across the functional areas of all facilities in the new centres –
F&B, ushers, technical, front-of-house, back-of-house, management and
other specialists
New opportunities for local/regional subject matter experts as keynote
29
Impractical due to 18 year sports lease and lack of any performance technical infrastructure which has been removed
30
Location is incompatible with desired integration as part of conference facility to sustain economic viability unless both are relocated to
this site
31
Noosa Arts Theatre seen as a preferred ‘user’ of a new theatre complex and meets their aim of a minimum 500 seat performance space
within five years
32
Alternatively, the gallery space could be designed as the functional Performing Centre foyer – similar to arts spaces in Europe and USA
where the synergy between art forms flow across and through each others physical spaces.
CCIQ Noosa © 2015-16 11 | P a g e
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.