Original source · versioned page text
QB1910553 - STG 1 19 Ind Units - Lot 13 (#64) - QB1910553 - MISC - Form 11 Final & Supporting Certificates - 26.11.2021 KW
Very large file: it may take a few minutes
The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
SEDIMENT BASIN DISCHARGE AUTHORITY turbid WATER SOLUTIONS Client: TLF developments Date: 29/10/20 Site: 64 gateway drive Noosavile Date of Last Rainfall: 28/10/20 Basin Capacity (m3): 55 Basin Reference: Sediment basin Inspecting Officer: Mike Back Basin Volume (m3): 55 Sample Date Parameter Tested Discharge Limit 6.5-8.5 75 Sample 1 6.4 945 Sample 2 6.5 949 Sample 3 6.5 947 Average © cE TABLE 2 ~ TREATMENT APPLIED (if required) Treatment Date Treatment Products used Dose Rate D 80ppm Treatment Time Total Volume/Mass Applied 6 litres Turbid Water Solutions | 5 Vision Court Noosaville QLD 4566) 07 54712290 Revision I Issued 19/08/2019 TWS-FM-04
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.