Skip to the record
Beware of cheap imitations.

Original source · versioned page text

QB1910553 - STG 1 19 Ind Units - Lot 13 (#64) - QB1910553 - MISC - Form 11 Final & Supporting Certificates - 26.11.2021 KW

of 97

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

TODB

engineers & project managers

   
 
 
  
   
 

  
  
  

BT Tee 18556 64 Gateway Drive, Stage 1
CONSTRUCTION INPUT / INSPECTION RECORD

   
  

   
   

 

    

 

Date: Inspector: Inspected Item Re-inspected
(initials) and approved:

13/11/2020 HG . Prepour inspection of RW1 and RW2 footings: Ok to pour

* Any rubble and debris to be pulled out before pour

* Starter bars to be installed for the basin blockwork walls

= Screwpile certification to be provided

2. RW3 footing not complete during inspection — photos provided of RW3 before pour

17/11/2020 HG 8. Prepour inspection of GB1 and GB2 footings (unit 38-42): Ok to pour

= Bottom cover not adequate in some spots — cages were re-chaired during inspection,
= Western GB1 footing cage had no side cover — cage was moved over during inspection to achieve
adequate side cover.
= Any rubble and debris to be pulled out before pour.
* Where stop pour— after concrete cured, break out loose concrete overpour ready for next pour.
Vibrate all concrete, maintain cover during pour.
18/11/2020 HG 4. Prepour inspection of GB1 and GB2 footings (unit 32-38): Photos to be sent
= Bottom cover not adequate in some spots ~ cages were re-chaired during inspection.
= Some side cover issues to GB2s as they were dropping cages in - cage to be moved over to achieve
adequate side cover and photos sent.
= Cages to unit 32/33 yet to be placed — photos to be sent
» Any rubble and debris to be pulled out before pour.
= Where stop pour- after concrete cured, break out loose concrete overpour ready for next pour.
Vibrate all concrete, maintain cover during pour.
20/11/2020 HG 5. Prepour inspection of GB1 and GB2 footings (unit 30-31): ok
« Any rubble and debris to be putled out before pour.
* Where stop pour- after concrete cured, break out loose concrete overpour ready for next pour.
Vibrate all concrete, maintain cover during pour.
20/11/2020 HG 6. Prepour inspection of RW1-RW2 Blockwork walls ok
* Horizontal bars missing -- these were being drilled and feed through end of blockwork during and
after inspection
= Vertical bars to be held and adjusted to maintain position and cover — ensure inner tie bars to slab
positioned to avoid precast wall panels

 

 

 

 

 

 

 

 

Noosa: 07 5449 9600 inspection Record Page 1 of 3

Ted Job Number: 18556
hl Hs 9 31: i i
ieee outstanding results personal service

PO Box 61, Noosavilte, QLD 4566, Australia infrastructure buildings subdivisions placemaking
www.todconsuiting.com
Log in to download the original file

QB1910553 - STG 1 19 Ind Units - Lot 13 (#64) - QB1910553 - MISC - Form 11 Final & Supporting Certificates - 26.11.2021 KW.pdf · 10.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.