QB1910553 - STG 1 19 Ind Units - Lot 13 (#64) - QB1910553 - MISC - Form 11 Final & Supporting Certificates - 26.11.2021 KW

of 97

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Date:

Inspector:
(initiats)

TODB

engineers & project managers

Inspected Item

Re-inspected
and approved:

 

25/11/2020

HG

. Prepaur inspection of GB1 and GB2 footings (unit 24-27):

«Finish placing cages to unit 27 ensuring correct top, bottom and side cover,

" Any rubble and debris fo be pulled out before pour,

« Where stop pour~ after concrete cured, break out ioose concrete overpour ready for next pour.
Vibrate all concrete, maintain cover during pour.

Photos to be sent

 

07/12/2020

HG

. Site meeting with B Paterson and S Davies of Tectonic re organics in building pad certified fill. BP said
once the wall is Stage 2 RW2 built they will return and excavate and remove the dark organic looking
fili as discussed with Geotech.

 

09/12/2020

HG

9. Prepour inspection of Stage 2 (Pod D) RW2 footing:
* Any rubble and debris to be pulled out before pour
Vibrate all concrete, maintain cover during pour, pull out rebar stakes as possible

Ok to pour

 

10/12/2020

HG

10. Prepour inspection of Stage 2 (Pod C) RW2 footing:
= Lift’chair some of the shear key vertical bars to achieve bottom cover
* Add starter bars for the return walls at end of pods
= Any rubble and debris to be pulled out before pour
"= pull out rebar stakes, as possible, during pour
Vibrate all concrete, maintain cover during pour

Ok to pour

 

10/12/2020

HG

11. Prepour inspection of Stage 2 (Pod C) RW2 footing:
= Check cover and rechair cage as required
«= Any rubble and debris to be pulled out before pour
" pull out rebar stakes, as possible, during pour
* Photos to be taken

Vibrate all concrete, maintain cover during pour

Photos to be
provided

 

28/01-
25/02/2021

HG

12. Intermittent Prepour inspections of precast panels and review of prepour photos

N/A

 

08/04/2021

HG

13. Stood precast panel inspection

ok

 

16/04/2021
21/04/2024

 

 

HG/SP.

 

14. Roof framing inspection to enable removal of precast panel props

 

 

Ok to remove
props

 

Noosa: 07 5449 9600
Sunshine Coast: 07 53293190
Mackay: 07 4840 2337

PO Box 61, Noosaville, OLD 4566, Australia

wwwitodconsulting.com

Inspection Record Page 2 of 3
. Tod Job Number: 18556
outstanding results personal service

infrastructure buildings subdivisions placemaking
Log in to download the original file

QB1910553 - STG 1 19 Ind Units - Lot 13 (#64) - QB1910553 - MISC - Form 11 Final & Supporting Certificates - 26.11.2021 KW.pdf · 10.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.