QB1910553 - STG 1 19 Ind Units - Lot 13 (#64) - QB1910553 - MISC - Form 11 Final & Supporting Certificates - 26.11.2021 KW

of 97

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

 

accordance with design drawings and specifications, The earthworks and structures dictate the movement of stormwater through
the bioretention system and are a critical element in the function of the system,

 

Items Checked Satisfactory Action (if unsatisfactory) | Initial

 

DR- site check only | Yes

with tape measure -
As constructed survey completed and no survey - concrete

attached to this form foor and retaining
walls

 

 

Photos taken and attached to this form

 

 

 

 

 

 

 

 

 

 

Set-out of system is correct DR Yes
Base levels are at correct elevation (450 | DR Yes
mm)

Base at correct grading (0.5%) DR Yes
Punch out holes in overflow pit are DR Yes
correct size, correct level and above

invert level of outlet pipe (+25 mm)

Overflow pit is correct size and crest and OR Yes
invert is at correct level (+25 mm)

Outlet pipe invert fevels are correct DR Yes
{upstream and downstream) (+25 mm)

Outlet pipe is free draining DR Yes
Overflow weir (if required) is correct DR Yes

length and at correct level (+25 mm)

 

Overflow weir (if required) is keyed into | N/A
bund

Bunds/embankments surrounding the DR - retaining walls Yes
system are at correct levels or above

 

 

 

   

 

 

 

 

 
  
 

 

Comments (attach and refer to additional pages if necessary)

 

 

 

L

NB: As constructed survey and drawings and photos attached.

Signed by superintendent: bo

a
Printname: _ Doug Reynolds
Date:__06/10/2021
AND

Signed by bioretention designer:
Se

Print name:

 

Date:

  

FORM B — Whit erly

 
 

CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS — BIORETENTION SYSTEMS 4

© South East Queensland Healthy Waterways Partnership 2010
Log in to download the original file

QB1910553 - STG 1 19 Ind Units - Lot 13 (#64) - QB1910553 - MISC - Form 11 Final & Supporting Certificates - 26.11.2021 KW.pdf · 10.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.