Skip to the record
For the highest quality transcripts.

Original source · versioned page text

QB1910553 - STG 1 19 Ind Units - Lot 13 (#64) - QB1910553 - MISC - Form 11 Final & Supporting Certificates - 26.11.2021 KW

of 97

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

 

 

 

 

 

 

 

 

 

 

 

 

 

Purpose: To ensure under-drainage is installed correctly before the bioretention media is installed,
Items Checked Satisfactory Action (if unsatisfactory) Initial
Base of system free from debris OR Yes

Liner (typically filter cloth) correctly DR Yes

installed

There is no fabric ‘sock’ around the DR Yes

under-drainage

Correct under-drainage has been DR Yes

supplied and slotted at 2mm or smaller,

Under-drainage pipes are laid at the DR Yes

correct spacing (small bioretention

 

 

system 1.5 m, large system 2 m)

Required grade (verified using level or
string line)

Under-drainage pipes laid at required | DR - with smart level Yes
Brade (verified using level or string line
to achieve design level #25 mm and
0.5% grade)

All junctions and connections have DR Yes
been appropriately sealed

 

 

 

Top of clean out points at design level | DR Yes
(Le. approximately 50-150 mm above
filter media surface )

 

 

 

 

 

   
  

 

Comments (attach and refer to additional pages if necessary)

 

 

 

L_

NB: As constructed survey and drawings and photos attached.

Signed by superintendent: bo

Print name: _ Doug Reynolds
Date: 06/10/2021

AND

Signed by bioretention designer:
ee

Print name:

 

Date:

   
 

elt Reem toll it iw CT TeT

CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS — BIORETENTION SYSTEMS 5

© South East Queensland Healthy Waterways Partnership 2016
Log in to download the original file

QB1910553 - STG 1 19 Ind Units - Lot 13 (#64) - QB1910553 - MISC - Form 11 Final & Supporting Certificates - 26.11.2021 KW.pdf · 10.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.