Skip to the record
Every meeting, every word.

Original source · versioned page text

QB1910553 - STG 1 19 Ind Units - Lot 13 (#64) - QB1910553 - MISC - Form 11 Final & Supporting Certificates - 26.11.2021 KW

of 97

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

 

Checked Satisfactory Action {if unsatisfactory) Initial

 

Base of system free from debris

 

Drainage layer (fine gravel} installedto | DR Yes
correct depth (+ 25 mm)

 

Transition layer (coarse sand) installed | DR Yes
to correct depth (+ 25 mm}

 

Placement of filter media completed to | DR Yes
avoid compaction of media and using
at least two lifts

 

 

 

 

Filter media installed to correct depth | OR Yes
Light, even compaction applied to DR Yes
remove air gaps (e.g. fight roller or
single pass with a ‘pozitrack’ bobcat)
Spreader bar used to flatten surface of | DR Yes
filter media

N/A N/A

Sediment fences in place

 

 

 

 

 

INSPECTION: Superintendent and bioretention designer inspection and sign-off to occur while installation of media is occurring.
Photos must be taken by the superintendent, the bioretention designer or the contractor,

 

Comments {attach and refer to additional pages if necessary)

 

 

 

 

NB: Laboratory test results, certification, delivery dockets and photos attached.

Signed by superintendent: bb~

Print name: ___ Doug Reynolds
Date: 06/10/2021

AND

Signed by bioretention designer:
Print name:

Date:
eee

FORM D — Finished Levels

 

  
 

 

 

Purpose: To ensure finished levels of system surface and bunds are correct and meet the design.

 

 

 

Items Checked Satisfactory Action {if unsatisfactory} Initial

 

 

 

 

 

CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS ~ BIORETENTION SYSTEMS 7

© South East Queensiand Healthy Waterways Partnership 2010
Log in to download the original file

QB1910553 - STG 1 19 Ind Units - Lot 13 (#64) - QB1910553 - MISC - Form 11 Final & Supporting Certificates - 26.11.2021 KW.pdf · 10.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.