Original source · versioned page text
QB1910553 - STG 1 19 Ind Units - Lot 13 (#64) - QB1910553 - MISC - Form 11 Final & Supporting Certificates - 26.11.2021 KW
Very large file: it may take a few minutes
The original of this document is very large (10.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Landscaping topsoil applied to DR Yes surrounding bunds to achieve design levels As-constructed survey of system Not necessary - retaining surface and surrounding bunds wall levelscheck from completed floor levels of units Final constructed levels are consistent | DR Yes with design levels Under-drainage clean-outs extended DR Yes 50-150 mm above filter media Under-drainage pipes flushed to DR Yes remove initial ingress of material | HOLD POINT: Superintende: int and bloretention designer inspection and sign-off before proceeding. Comments (attach and refer to additional pages if necessary) NB: As constructed survey and drawings and photos attached. Signed by superintendent: beim Printname:___ Doug Reynolds Date: ___ 06/10/2021 AND Signed by bioretention designer: Print name: Date: i FORM E — Coarse Sediment relay} a Purpose: To ensure the coarse sediment forebay is constructed correctly. a Action (if = y Items Checked Satisfactory unsatisfactory) initial Extent of coarse sediment forebay NA due to catchment size correctly set out CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS — BIORETENTION SYSTEMS 8 © South East Queensland Healthy Waterways Partnership 2010
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.