Council archive · source document
Appendix D Geotechnical report · MCU18/0013
Attached to the e-mail Detached House - MCU18/0013.
Project No. 304-2014 November, 2004 Page 6 The subgrade should be proof rolled (where appropriate) under the supervision of Soil Surveys Engineering using a vehicle with a tare of at least 5 tonnes and then compacted to the required degree. In areas of cut, proof rolling may be deferred until after the cut operation. Areas demonstrating excessive movement should be treated (dried and recompacted) or removed and replaced with compacted fill. Treatment should be to a standard sufficient so that the subgrade passes proof rolling and that compaction can be achieved in the first layer of fill. 6.2.3 Fill Material While it is noted that significant filling is not anticipated, backfilling around the proposed in-ground water tank should be carried out in accordance with AS.3798-1996, and the following should be noted: The insitu soils, where free of organic and deleterious material, may be used for structural fill provided the moisture content of the soils on placement approximates the optimum moisture content required for compaction. This may require conditioning to bring the soils to optimum. Any imported fill, if needed to make up earthwork deficiencies, should have a soaked CBR of not less than 10 percent and a maximum aggregate size of not greater than 75mm with not more than 20% greater than 20mm. 6.2.4 Compaction Standards Guidelines for minimum relative compaction values for insitu soils and imported fill for the building and pavements are presented in Table 2. TABLE 2 COMPACTION RECOMMENDATIONS Location Minimum Density Index Building Area 70 * Field density testing should be carried out to check the standard of compaction achieved and the placement moisture content. The frequency and extent of testing should be as per guidelines in AS.3798-1996, Section 8.0. Backfilling for service trenches etc. should use good quality material free of organic and deleterious matter, either select fill won from site or imported fill. The backfill should be placed in uniform layers over the full width of the excavations with the layers not exceeding 200mm thickness, loosely placed. The backfill material should be compacted to the specifications outlined above for insitu or imported cohesive material. # SOW SURVEYS ENGINEERING
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Geotechnical report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.