Council archive · source document
Appendix D Geotechnical report · MCU18/0013
Attached to the e-mail Detached House - MCU18/0013.
Project No. 304-2014 November, 2004 Page 7 6.2.5 Earthworks Supervision Given the building type and the nature of the earthworks operation associated with the in-ground water tank, it is recommended that earthworks operations be carried out under geotechnical engineering supervision as set out in Appendix B of AS.3798-1998. It should be made clear in any earthworks specification as to what is actually required of the Engineer/Supervisor/Geotechnical Testing Authority to provide in terms of certification. It is recommended that the following objectives (as a minimum) be incorporated into the earthworks specification:- * Certification that all general earthworks operations (ie. stripping, proof rolling of subgrade, etc.) have been carried out in accordance with the earthworks specification. * Certification that uncontrolled fill has been replaced (if required) and compacted to the required minimum density in accordance with the earthworks specification. ° Certification that the controlled fill material is suitable to support a conventional slab on ground floor (slab loads of 10 to 15kPa). * Certification that the quality of any imported fill complies with the earthworks specification requirements. Engineering certification should be provided by a Registered Professional Engineer of Queensland. 6.2.6 Excavation Characteristics It is anticipated that excavations will consist of the following:- * Bulk Cuts - for site stripping and excavation to create basements, building platforms and carpark/driveway areas. * Trenching - for high level footings and underground services. * Drilling - for bored pier foundations. Excavations on site should be within the capabilities of light plant, small dozer (Cat D4c or similar) in bulk cuts and a medium sized backhoe (Case 580 or similar) or small excavator (12t - 15t) in trenching, based on the investigation findings. Should substantial excavations be required, larger plant could be budgeted to expedite workings. # SOW SURVEYS ENGINEERING
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Geotechnical report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.