Project No. 304-2014 November, 2004 Page 17 6.5.5 Construction Details With all retaining walls, it is essential that adequate drainage be provided behind the wall. Any backfill placed behind the wall should be loose granular material. The backfill should not be heavily compacted since research has shown that compaction can raise the earth pressure to above the ‘at rest’ pressure. A permeable geofabric should be placed between the natural soils and the loose granular backfill to prevent fine material piping out of the natural soils and blocking the backfill. During installation of any retaining walls, the insitu soils should be battered back to minimise fall-in and subsequent disruption of works. Temporary batter angles are given in Section 6.2.7. Suitable precautions to satisfy Health & Safety requirements must also be adhered to; a maximum unsupported height of 1.5m is recommended. CONSTRUCTION INSPECTION It is recommended that placement of all structural fill, footing excavations, and cut batter slopes in soil together with building subgrades should be inspected by Soil Surveys Engineering Pty Limited. or a duly qualified Geotechnical Engineer. Should subsurface conditions other than those described in this report be encountered, Soil Surveys Engineering Pty Limited. should be consulted immediately and appropriate modifications developed and implemented if necessary. # SOIL SURVEYS ENGINEERING
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Geotechnical report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.