2202-27255 SRA - Response with conditions
Attached to the e-mail OPW22/0029 - SRA application correspondence - Referral agency response – with conditions.
2202-27255 SRA
Attachment 1—Referral agency conditions
(Under section 56(1)(b)(i) of the Planning Act 2016 the following conditions must be attached to any development
approval relating to this application) (Copies of the plans and specifications referenced below are found at
Attachment 5)
No. Conditions Condition timing
Operational work for prescribed tidal works (habitat restoration)
10.17.3.2.1—The chief executive administering the Planning Act 2016 nominates the Director-General
of the Department of Transport and Main Roads (Maritime Safety Queensland) to be the enforcement
authority for the development to which this development approval relates for the administration and
enforcement of any matter relating to the following conditions:
1. The development must be carried out generally in accordance with At all times
the following plans:
(a) General Notes and Site Selection prepared by International
Coastal Management dated 09/07/2021, Drawing Number
NROR-2021-00 Revision A.
(b) Module Designs prepared by International Coastal
Management dated 09/07/2021, Drawing Number NROR-
2021-02 Revision A.
(c) Phase 1 – Goat Island Restoration Site prepared by
International Coastal Management dated 09/07/2021,
Drawing Number NROR-2021-03 Revision A as amended in
red by SARA dated 07/04/2022.
(d) Phase 1 – Tewantin Restoration Site prepared by
International Coastal Management dated 09/07/2021,
Drawing Number NROR-2021-04 Revision A as amended in
red by SARA dated 07/04/2022.
(e) Phase 1 – Noosa Sound West Restoration Site prepared by
International Coastal Management dated 09/07/2021,
Drawing Number NROR-2021-05 Revision A.
(f) Phase 1 – Noosa Sound East Restoration Site prepared by
International Coastal Management dated 09/07/2021,
Drawing Number NROR-2021-06 Revision A.
2. The development must be carried out generally in accordance with For the duration of
the Noosa Oyster Ecosystem Restoration Project - Project works
Restoration Plan prepared by The Nature Conservancy Australia
dated January 2022, as amended in red by SARA dated 07/04/2022
3. All vessels, structures, plant and equipment associated with the While the works are
construction of the approved works must be lit/marked in accordance occurring
with the following specifications and requirements such that
undertaking the construction works does not cause a risk to the safe
navigation of ships:
(a) any anchors deployed must be marked with yellow buoys and
fitted with FL yellow lights fitted
Lighting provided must not obscure, disguise or otherwise interfere
with the effectiveness of navigational lighting.
10.17.3.2.1— The chief executive administering the Planning Act 2016 nominates the Director-General
of the Department of Environment and Science to be the enforcement authority for the development to
which this development approval relates for the administration and enforcement of any matter relating
to the following conditions:
State Assessment and Referral Agency Page 4 of 13