2202-27255 SRA - Response with conditions
Attached to the e-mail OPW22/0029 - SRA application correspondence - Referral agency response – with conditions.
2202-27255 SRA
4. The construction of the oyster reefs must be undertaken generally in For the duration of the
accordance with the following plans: works.
General Notes and Site Selection prepared by International
Coastal Management dated 09/07/2021, Drawing Number
NROR-2021-00 Revision A.
Module Designs prepared by International Coastal
Management dated 09/07/2021, Drawing Number NROR-
2021-02 Revision A.
Phase 1 – Goat Island Restoration Site prepared by
International Coastal Management dated 09/07/2021,
Drawing Number NROR-2021-03 Revision A.
Phase 1 – Tewantin Restoration Site prepared by
International Coastal Management dated 09/07/2021,
Drawing Number NROR-2021-04 Revision A.
Phase 1 – Noosa Sound West Restoration Site prepared by
International Coastal Management dated 09/07/2021,
Drawing Number NROR-2021-05 Revision A.
Phase 1 – Noosa Sound East Restoration Site prepared by
International Coastal Management dated 09/07/2021,
Drawing Number NROR-2021-06 Revision A.
5. For the proposed works, only use clean materials and ensure that For the duration of the
the works do not cause contamination. works.
6. Erosion and sediment control measures which are in accordance For the duration of the
with Best Practice Erosion and Sediment Control (BPESC) works.
guidelines for Australia (International Erosion Control Association),
are to be installed and maintained to prevent the release of sediment
to tidal waters.
7. Should the oyster reef structures collapse, fail or otherwise suffer As soon as reasonably
structural consequences which impact their integrity or ability to practicable subsequent
function as intended, the works must be: to the damage.
a. reinstated in accordance with this development approval; or
b. removed and disposed of at an appropriately licensed facility.
8. Submit “As Constructed drawings” to [email protected] or mail Within two (2) weeks of
to: the completion of the
Department of Environment and Science works.
Permit and Licence Management
Implementation and Support Unit
GPO Box 2454
Brisbane Qld 4001
9. (a) In the event that the works cause disturbance or oxidisation of (a) Upon
acid sulfate soil, the affected soil must be treated and disturbance or
thereafter managed (until the affected soil has been oxidisation until
neutralised or contained) in accordance with the current the affected soil
Queensland Acid Sulfate Soil Technical Manual: Soil has been
management guidelines, prepared by the Department of neutralised or
Science, Information Technology, Innovation and the Arts, contained.
2014.
(b) At the time the
(b) Certification by an appropriately qualified person, soils have been
confirming that the affected soil has been neutralised or neutralised or
State Assessment and Referral Agency Page 5 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.