2202-27255 SRA - Response with conditions
Attached to the e-mail OPW22/0029 - SRA application correspondence - Referral agency response – with conditions.
2202-27255 SRA
These notices must state this permit number 2202-27255 SRA. commencement of the
works
Within 15 business
days of the completion
of the fisheries
development works
14. Spoil or construction debris is not disposed of on tidal lands or within At all times
waterways and is managed to prevent acid soil development.
15. This fisheries development (as defined by the Fisheries Act 1994) At all times
constitutes a place that is required to be open for inspection by an
inspector at all times, pursuant to section 145 of the Fisheries Act
1994.
16. Marine plants that are temporarily removed, damaged or destroyed Within 5 years of
by this development must be restored to pre-disturbance condition. removal, damage or
destruction of the
Note: Marine plants are matters of State environmental significance under marine plants.
the Environmental Offsets Act 2014. Due to the claims that restoration will
occur made in this development application these have not been included in
a significant residual impact for the purpose of calculating an environmental
offset for this development. Failure to rehabilitate or restore these marine
plants within 5 years will represent unlawful removal damage or destruction
of marine plants under the Fisheries Act 1994 from that date.
17. The area shown as the ‘buffer zone’ from mangroves and seagrass Prior to
on plans: commencement of the
Phase 1 – Tewantin Restoration Site, International Coastal works and maintained
until their completion
management, 05 Aug 2021, NROR-2021-04, Revision A and
amended in red by SARA dated 07/04/2022; and
Phase 1 – Goat Island Restoration Site, International Coastal
management, 05 Aug 2021, NROR-2021-03, Revision A and
amended in red by SARA, dated 07/04/2022
is to be clearly marked with corner pegs and/or buoys and protected
with sediment curtains if required to prevent development works and
associated activities (sedimentation access) from entering the ‘buffer
zone’.
18. Mark with corner pegs and/or buoys, the boundary of the approved Until completion of the
tidal component of the development footprint, as shown on: installation of rock and
Phase 1 – Tewantin Restoration Site, International Coastal any signage.
management, 05 Aug 2021, NROR-2021-04, Revision A and
amended in red by SARA dated 07/04/2022; and
Phase 1 – Goat Island Restoration Site, International Coastal
management, 05 Aug 2021, NROR-2021-03, Revision A and
amended in red by SARA dated 07/04/2022.
19. Tidal land profiles that are temporarily disturbed by the development Upon completion of the
works (other than those within the permanent development footprint), works the subject of
as shown on: this approval
Phase 1 – Tewantin Restoration Site, International Coastal
management, 05 Aug 2021, NROR-2021-04, Revision A and
amended in red by SARA dated 07/04/2022; and
Phase 1 – Goat Island Restoration Site, International Coastal
management, 05 Aug 2021, NROR-2021-03, Revision A and
amended in red by SARA dated 07/04/2022
must be promptly restored to pre-work profiles.
20. The oyster reefs and any associated infrastructure including, but not At all times
State Assessment and Referral Agency Page 7 of 13