2202-27255 SRA - Response with conditions

Attached to the e-mail OPW22/0029 - SRA application correspondence - Referral agency response – with conditions.

of 13

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                       2202-27255 SRA




        These notices must state this permit number 2202-27255 SRA.                     commencement of the
                                                                                        works

                                                                                        Within 15 business
                                                                                        days of the completion
                                                                                        of the fisheries
                                                                                        development works
14.     Spoil or construction debris is not disposed of on tidal lands or within        At all times
        waterways and is managed to prevent acid soil development.
15.     This fisheries development (as defined by the Fisheries Act 1994)               At all times
        constitutes a place that is required to be open for inspection by an
        inspector at all times, pursuant to section 145 of the Fisheries Act
        1994.
16.     Marine plants that are temporarily removed, damaged or destroyed                Within 5 years of
        by this development must be restored to pre-disturbance condition.              removal, damage or
                                                                                        destruction of the
        Note: Marine plants are matters of State environmental significance under       marine plants.
        the Environmental Offsets Act 2014. Due to the claims that restoration will
        occur made in this development application these have not been included in
        a significant residual impact for the purpose of calculating an environmental
        offset for this development. Failure to rehabilitate or restore these marine
        plants within 5 years will represent unlawful removal damage or destruction
        of marine plants under the Fisheries Act 1994 from that date.
17.     The area shown as the ‘buffer zone’ from mangroves and seagrass                 Prior to
        on plans:                                                                       commencement of the
         Phase 1 – Tewantin Restoration Site, International Coastal                    works and maintained
                                                                                        until their completion
             management, 05 Aug 2021, NROR-2021-04, Revision A and
             amended in red by SARA dated 07/04/2022; and
         Phase 1 – Goat Island Restoration Site, International Coastal
             management, 05 Aug 2021, NROR-2021-03, Revision A and
             amended in red by SARA, dated 07/04/2022
        is to be clearly marked with corner pegs and/or buoys and protected
        with sediment curtains if required to prevent development works and
        associated activities (sedimentation access) from entering the ‘buffer
        zone’.
18.     Mark with corner pegs and/or buoys, the boundary of the approved                Until completion of the
        tidal component of the development footprint, as shown on:                      installation of rock and
              Phase 1 – Tewantin Restoration Site, International Coastal               any signage.
                 management, 05 Aug 2021, NROR-2021-04, Revision A and
                 amended in red by SARA dated 07/04/2022; and
              Phase 1 – Goat Island Restoration Site, International Coastal
                 management, 05 Aug 2021, NROR-2021-03, Revision A and
                 amended in red by SARA dated 07/04/2022.
19.     Tidal land profiles that are temporarily disturbed by the development           Upon completion of the
        works (other than those within the permanent development footprint),            works the subject of
        as shown on:                                                                    this approval
             Phase 1 – Tewantin Restoration Site, International Coastal
                 management, 05 Aug 2021, NROR-2021-04, Revision A and
                 amended in red by SARA dated 07/04/2022; and
             Phase 1 – Goat Island Restoration Site, International Coastal
                 management, 05 Aug 2021, NROR-2021-03, Revision A and
                 amended in red by SARA dated 07/04/2022
        must be promptly restored to pre-work profiles.
20.     The oyster reefs and any associated infrastructure including, but not           At all times


State Assessment and Referral Agency                                                                     Page 7 of 13
Log in to download the original file

2202-27255 SRA - Response with conditions.pdf · 423 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.