Original source · versioned page text
2202-27255 SRA - Response with conditions
Attached to the e-mail OPW22/0029 - SRA application correspondence - Referral agency response – with conditions.
2202-27255 SRA
contained, in accordance with (a) above is to be provided to [email protected] or mailed to:
Department of Environment and Science
Permit and Licence Management
Implementation and Support Unit
GPO Box 2454
Brisbane Qld 4001
Note: Appropriately qualified person means a person or persons who has
professional qualifications, training, skills and experience relevant to soil
chemistry or acid sulfate soil management and can give authoritative
assessment, advice and analysis in relation to acid sulfate soil management
using the relevant protocols, standards, methods or literature.
10.6.2.3.1.1 and 10.6.3.3.1.1 — The chief executive administering the Planning Act 2016 nominates
the Director-General of the Department of Agriculture and Fisheries to be the enforcement authority for
the development to which this development approval relates for the administration and enforcement of
any matter relating to the following conditions:
10. Development authorised under this approval is limited as follows: At all times
Operational work for the temporary removal, destruction or
damage of marine plants for placement of oyster reef base
being limited to 479m2 of macroalgae and shown in Phase 1
– Tewantin Restoration Site, International Coastal
management, 05 Aug 2021, NROR-2021-04, Revision A and
amended in red by SARA dated 07/04/2022.
AND
The operational works within the Noosa River declared Fish
Habitat Area Management A being limited to trial restoration
of oyster reefs 2,504m2 in area and installation of
navigational and educational signage if required and shown
in the following plans:
Phase 1 – Tewantin Restoration Site, International
Coastal management, 05 Aug 2021, NROR-2021-04,
Revision A and amended in red by SARA, dated
07/04/2022; and
Phase 1 – Goat Island Restoration Site, International
Coastal management, 05 Aug 2021, NROR-2021-03,
Revision A and amended in red by SARA dated
07/04/2022.
11. The reef construction and sediment control must be carried out For the duration of
generally in accordance with Sections 6.1 and 6.4 of Noosa Oyster works
Ecosystem Restoration Project - Project Restoration Plan prepared
by The Nature Conservancy Australia dated January 2022, amended
in red by SARA dated 07/04/2022.
12. Maintain the signage and navigation markers development in At all times
accordance with the plans referenced in condition 10, and the
requirements of any conditions included in this referral agency
response.
13. Provide written notice to [email protected], when the At least 5 business
development authorised under this approval: days but no greater
(a) will start, and than 20 business days
(b) when it has been completed. prior to the
State Assessment and Referral Agency Page 6 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.