Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Target Implementation Strategy Performance Indicators 2.1.2.4 Rehabilitation plan Refer to Rehabilitation Plan Appendix B As per Rehabilitation Plan. 2.1.2.5 Recovery Plans 2.1.2.6 Protect the three large Hoop Pines near the lodge. 1 Design Review and the Construction and Operational Phase EMP The design and EMPs take account of the location of significant species Site investigations did not record the presence of plant species of significance that warranted referral under the Nature Conservation Act 1992 or the Commonwealth’s Environment Protection and Biodiversity Conservation Act 1999. Should the presence of species of significance be identified during future works a recovery plan that includes the identification of the location and extent of the species, measures to protect its presence and regeneration work required to protect its on ongoing survival are to be prepared. The three large Hoop Pines, including the roots, stem and branches are to be protected during the construction phase and operational phase of the development. This can be achieved through Determination and fencing of the Tree Protection Zone (TPZ). This area is equivalent to a circle around the tree with a diameter equal to, the Trunk Diameter x 10x 2, and with the trunk as the centre. No earthworks or soil] compaction are to be carried out within the TPZ. * No machinery movement or operations are to be carried out within the TPZ. No impervious surfaces including concrete slabs or bitumen areas are to be constructed within the TPZ. e Ail structures occupying the TPZ are to be constructed above ground and allow water to penetrate decks and other surfaces to reach the roots. Design and the Construction and Operational Phase EMP Design solutions are found to construct the lodge and associated structures to ensure no damage to the tree occurs during the construction and operational phases of the development. No damage is done to the roots, trunk or branches of the trees during the construction and operational phases. 2.1.2.7 Bushfire Management Construction and Operational Phase EMP As per 2.1.5 Refer to Bushfire Management Plan. Appendix C 2.1.2.8 Weed Management Refer to Rehabilitation Plan Appendix B As per Rehabilitation Plan. Management Procedures Clearing of vegetation shall be in accordance with the DNRMW Clearing permit and the Ministerial Conditions.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.