Particular Responsibilities Corrective Action Principal & Superintendent— Ensure Contractor has access to DNRW Clearing permit and the Ministerial Conditions Arrange pre-start meeting with Council. Engage and liaise with environmental auditor. Contractor — Clear vegetation as per DNRW Clearing permit and the Ministerial Conditions. Establishment of protective fencing around retained isolated trees and vegetation. Establishment of native revegetation over all exposed soil surfaces immediately after earthworks and latter implementation of a landscape plan. Environmental Auditor —Liaise with DNRW regarding compliance with the DNRMW clearing Approval. Assistance delineating areas to be fenced for retaining vegetation prior to vegetation clearing. Advice regarding any germination/establishment failures and corrective action. If protected areas are mistakenly cleared, revegetation of areas as per the original vegetation community. Control weeds with a Glyphosate product or manual removal.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.