Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ATTUNGA HEIGHTS PRELIMINARY EMP 2.1.8 Ground Water Quality Protection Management Plan The construction phase of the development has potential to allow pollutants to enter the ground water. The infiltration of pollutant to the ground Issues water can occur from single events such as chemical spills or from prolonged event such as runoff from polluted surface including machinery and hard surfaces such as driveways and roads. The operational phase of the development has potential to allow pollutants to enter the ground water through inappropriate use and disposal of chemicals and other pollutants by residents. Objectives To minimise the chance and severity of groundwater pollution. Implementation Strategy Performance Indicators 2.1.8.1 ‘The prevention of pollutants entering the groundwater table during the construction phase can be Construction and Operational Prevent polluted water or chemicals achieve by Phase EMP entering the ground water table Draining all Stormwater from driveway and roads into appropriate Stormwater cleaning devices. | No polluted water or chemicals enter Refer to Stormwater and Water Quality management Plan. the ground water table or to seep into Store all machinery offsite or on surfaces draining into Stormwater drains. watercourse Ensure all chemicals stored onsite are in appropriate containers and facilities. Refer to Storage and Handling of Hazardous Substances Management Plan. The prevention of pollutants entering the groundwater table during the operational phase can be achieve by * All grey water is to be drained to sewer. e Washing of cars, etc is to be carried out offsite. Residents are to be given information relating to the correct use, storage and disposal of household chemicals. Particular Responsibilities Principal & Superintendent - Develop Resident information pack. Contractor — Carryout staff training. Maintain vehicles and machinery. Arrange appropriate storage facilities. Arrange appropriate storage of vehicles. Report environmental incidents to EPA if environmental harm has occurred. Environmental Auditor — Undertake regular environmental inspections. Corrective Action Clean up spills immediate. Report spills that cause material environmental harm to EPA. Preliminary EMP: Attunga Heights Issue: 1 Chenoweth EPLA Revision: 0 12/12/2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.