Skip to the record
For the highest quality transcripts.

Council archive · source document

07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555

of 216

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.

ATTUNGA HEIGHTS PRELIMINARY EMP

2.1.8 Ground Water Quality Protection Management Plan

The construction phase of the development has potential to allow pollutants to enter the ground water. The infiltration of pollutant to the ground
Issues water can occur from single events such as chemical spills or from prolonged event such as runoff from polluted surface including machinery and

hard surfaces such as driveways and roads.

The operational phase of the development has potential to allow pollutants to enter the ground water through inappropriate use and disposal of

chemicals and other pollutants by residents.

Objectives To minimise the chance and severity of groundwater pollution.

Implementation Strategy Performance Indicators

2.1.8.1 ‘The prevention of pollutants entering the groundwater table during the construction phase can be Construction and Operational
Prevent polluted water or chemicals achieve by Phase EMP
entering the ground water table Draining all Stormwater from driveway and roads into appropriate Stormwater cleaning devices. | No polluted water or chemicals enter
Refer to Stormwater and Water Quality management Plan. the ground water table or to seep into
Store all machinery offsite or on surfaces draining into Stormwater drains. watercourse
Ensure all chemicals stored onsite are in appropriate containers and facilities. Refer to Storage
and Handling of Hazardous Substances Management Plan.

The prevention of pollutants entering the groundwater table during the operational phase can be
achieve by

* All grey water is to be drained to sewer.

e Washing of cars, etc is to be carried out offsite.
Residents are to be given information relating to the correct use, storage and disposal of household
chemicals.

 

 

Particular Responsibilities Principal & Superintendent - Develop Resident information pack.

Contractor — Carryout staff training. Maintain vehicles and machinery. Arrange appropriate storage facilities. Arrange appropriate
storage of vehicles. Report environmental incidents to EPA if environmental harm has occurred.

Environmental Auditor — Undertake regular environmental inspections.

Corrective Action Clean up spills immediate. Report spills that cause material environmental harm to EPA.

Preliminary EMP: Attunga Heights Issue: 1

Chenoweth EPLA Revision: 0 12/12/2007

 

Used in these records

About this file

File size
14.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2555 - Operational Works - Drainage Stormwater Vegetation [As Published].pdf · 14.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.