Council archive · source document
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published] · 142007.2555
Very large file (14.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ATTUNGA HEIGHTS PRELIMINARY EMP 2.1.9 Air Quality Management Plan Issues Objectives 2.1.9.1 Maintain air quality levels to within the EPA’s targets values. Inctuding, but not limited to, levels of dust and smoke levels (particles) and pollutant from machine exhausts. Refer Appendix E Management Procedures Particular Responsibilities Corrective Action The nature of the on-site sandy soils and the vegetated nature of the site will assist in mitigating against dust and the prohibition of buming will avoid smoke related issues. Nevertheless, construction will involve earthworks, vehicle movements and other activities with the potential to produce air-bome particulates locally. To control dust and smoke in accordance with the requirements of the Environmental Protection Act, 1994 and the Environmental Protection (Air) Policy 1997 which preclude the release of dust in a manner that is unreasonable and causes environmental harm (Part 4, Division 14, Environmental Protection (Air) Policy 1997) Implementation Strategy Performance Indicators Vehicles and machinery will be serviced regularly and tumed off when not required, rather than left idling, | Absence of air quality related Bare earth will be kept watered, especially on windy days. complaints from adjacent neighbors Disturbed areas shall be of minimum size to allow an area to be worked and re-established and stabilised or others. prior to moving off the site. Service and maintain machinery and vehicles, avoid long periods of idling. Avoid long continuous fire-prone windrows of cleared vegetation. Water, road works, batters and ail bare earth when dry and especially when being worked and in windy conditions. Establish a complaints procedure and advise neighbors. On-site staff wilt receive induction in dust suppression reduction techniques. Contractor — Establish a complaints recording procedure and notify neighbours, control trucking and other sub-contractors; Meet performance indicators for air quality as defined in the EMP. Implement and maintain the Air Quality Management Plan. Works identified as causing undue dust will cease immediately and the Contractor will investigate the problem and implement appropriate mitigation measures. Management procedures may need to be modified to achieve compliance (to the satisfaction of the Superintendent and Environmental Auditor). Review air quality measures and modify accordingly. Preliminary EMP: Attunga Heights issue: 1 Chenoweth EPLA Revision: 0 12/12/2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2555 - Operational Works - Drainage Stormwater Vegetation [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.